Salem Township

WCRC staff produced the 2025 Salem Township Local Road Funding Packet which includes information about the Local Road Matching Program, road funding, asset management and road treatments. Below is a summary of the roads, bridges and culverts located in Salem Township.

Primary Roads  

  • 34.25 miles of paved primary roads  
  • 0.94 miles unpaved primary roads 
  • 0 bridges (more than 20’ span) 
  • 12 culverts, greater than 5’ in diameter 

Local Roads  

  • 7.5 miles of local paved roads 
  • 33.60 miles of local unpaved roads 
  • 2 bridges (more than 20’ span) 
  • 17 culverts on local collector roads, greater than 5’ in diameter 

WCRC has also provided a link to the township website, see button below.

Township Website

Latest Updates

October 3, 2025 Virtual Public Meeting: Dixboro Road at Pontiac Trail Rd Roundabout (Northfield & Salem Twps)

PROJECT: Dixboro Road at Pontiac Trail Roundabout Project

WHEN: Tuesday, October 28, 2025, at 11 a.m.

WHERE: Online: https://bit.ly/wcrcprojectmeeting

By Phone: (929) 205-6099, Meeting ID: 879 2332 8754

WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the Dixboro Road at Pontiac Trail Rd Roundabout in Northfield and Salem in Townships.

The virtual public meeting will be held via Zoom on Tuesday, October 28, 2025, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.

Click here to learn more about joining the virtual meeting.

CONTACT: If you have any questions concerning this project, please contact Jane Allen, Project Manager, at (734) 327-6691, or via email at [email protected]

WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].

ISSUE DATE: 10/03/25

September 30, 2025 Revised Road Closure: Dickerson Rd (Salem Twp)

WHEN: Monday, September 15, 2025

WHERE: Dickerson Rd between South St and 6 Mile Rd in Salem Township

WHY: Permit work-storm sewer

BACKGROUND: On Monday, September 15, 2025, Salem Township closed Dickerson Rd between South St and 6 Mile Rd in Salem Township for storm sewer work.

The project has been extended and is expected to take approximately seven weeks to complete. However, all dates are tentative and subject to change due to weather conditions.

The road will be closed to all through traffic during this time.

CONTACT: If you have any questions concerning this work, please contact Tony Tyler, Project manager, (734)845-6155, or via email at [email protected]

ISSUE DATE: 09/30/25

September 19, 2025 Road Reopen: Pontiac Trail (Salem Twp)

WHEN: Friday, September 19, 2025

WHERE: Pontiac Trail between N. Territorial Rd and 6 Mile Rd in Salem Township

WHY: Culvert replacement completed

BACKGROUND: On Friday, September 19, 2025, the Washtenaw County Road Commission (WCRC) will reopen Pontiac Trail between N. Territorial Rd and 6 Mile Rd in Salem Township.

CONTACT: If you have any questions concerning this emergency closure, please contact Ken Harris, Superintendent of Maintenance at (734) 327-6696.

ISSUE DATE: 09/19/25

September 18, 2025 Revised Road Closure: 6 Mile Rd (Salem Twp)

WHEN: Tuesday, September 9, 2025

WHERE: 6 Mile Rd between Currie Rd and Chubb Rd in Salem Township

WHY: Permit work: storm drain reconstruction

BACKGROUND: On Tuesday, September 9, 2025 Salem Township closed 6 Mile Rd between Currie Rd and Chubb Rd in Salem Township for permit work.

The permit work has been extended. The permit work is expected to take approximately 9 weeks to complete. However, all dates are tentative and subject to change due to weather conditions.

The road will be closed to all through traffic. Access will be maintained only for residents and property owners who live, work or own property within the closure limits.

CONTACT: If you have any questions concerning this work, please contact Steve Roberts, project manager, (248) 437-5360, or via email at [email protected]

ISSUE DATE: 09/18/25

September 11, 2025 Revised Daytime Road Closure: Dickerson Rd (Salem Twp)

WHEN: Monday, September 15, 2025

WHERE: Dickerson Rd between South St and 6 Mile Rd in Salem Township

WHY: Permit work-storm sewer

BACKGROUND:  On Monday, September 15, 2025, Salem Township will close Dickerson Rd between South St and 6 Mile Rd in Salem Township for storm sewer work.

The project is expected to take approximately three weeks to complete. However, all dates are tentative and subject to change due to weather conditions.

The road will be closed to all through traffic during this time.

CONTACT: If you have any questions concerning this work, please contact Tony Tyler, Project manager, (734)845-6155, or via email at [email protected]

ISSUE DATE: 09/11/25

September 11, 2025 Road Closure Advisory: Dickerson Rd (Salem Twp)

WHEN: Monday, September 15, 2025

WHERE: Dickerson Rd between South St and Main St in Salem Township

WHY: Permit work-storm sewer

BACKGROUND: On Monday, September 15, 2025, Salem Township will close Dickerson Rd between South St and Main St in Salem Township for storm sewer work.

The project is expected to take approximately three weeks to complete. However, all dates are tentative and subject to change due to weather conditions.

The road will be closed to all through traffic during this time.

CONTACT: If you have any questions concerning this work, please contact Tony Tyler, Project manager, (734)845-6155, or via email at [email protected]

ISSUE DATE: 09/11/25

September 10, 2025 Daytime Road Closure: Dixboro Rd (Northfield & Salem Twps)

WHEN: Wednesday, September 17, 2025

 WHERE: Dixboro Rd between Pontiac Trail and N. Territorial Rd in Northfield and Salem Townships

WHY: Culvert replacement

BACKGROUND: On Wednesday, September 17, 2025, the Washtenaw County Road Commission (WCRC) will close Dixboro Rd between Pontiac Trail and N. Territorial Rd in Northfield and Salem Townships during daytime hours for a culvert replacement.

The road improvements are expected to take approximately three days to complete. However, all dates are tentative and subject to change due to weather conditions.

 CONTACT:  If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

 ISSUE DATE: 09/10/25

September 10, 2025 Road Closure: Pontiac Trail (Salem Twp)

WHEN: Monday, September 15, 2025

WHERE: Pontiac trail between N. Territorial and 6 Mile Rd in Salem Township

WHY: Culvert replacement

BACKGROUND: On Monday, September 15, 2025, the Washtenaw County Road Commission (WCRC) will close Pontiac Trail between N. Territorial and 6 Mile Rd in Salem Township for a culvert replacement.

The work is expected to take approximately 5 days to complete. However, all dates are tentative and subject to change due to weather conditions.

The road will be closed to all through traffic. Access will be maintained only for residents and property owners who live, work or own property within the closure limits.

DETOUR: Detour map

CONTACT: If you have any questions concerning this emergency closure, please contact Ken Harris, Superintendent of Maintenance at (734) 327-6696.

ISSUE DATE: 09/10/25

 

September 9, 2025 Road Closure: 6 Mile Rd (Salem Twp)

WHEN: Tuesday, September 9, 2025

WHERE: 6 Mile Rd between Currie Rd and Chubb Rd in Salem Township

WHY: Permit work: storm drain reconstruction

BACKGROUND: On Tuesday, September 9, 2025, Salem Township will close 6 Mile Rd between Currie Rd and Chubb Rd in Salem Township for permit work.

The work is expected to take approximately 7 days to complete. However, all dates are tentative and subject to change due to weather conditions.

The road will be closed to all through traffic. Access will be maintained only for residents and property owners who live, work or own property within the closure limits.

CONTACT: If you have any questions concerning this work, please contact Steve Roberts, project manager, (248) 437-5360, or via email at [email protected]

ISSUE DATE: 09/09/25

September 4, 2025 Daytime Road Closure: Dixboro Rd (Northfield & Salem Twps)

WHEN: Wednesday, September 10, 2025

WHERE: Dixboro Rd between Pontiac Trail and North Territorial Rd in Northfield and Salem Townships

WHY: Culvert replacement

BACKGROUND: On Wednesday, September 10, 2025, the Washtenaw County Road Commission (WCRC) will  close Dixboro Rd between Pontiac Trail and North Territorial Rd in Northfield and Salem Townships during daytime hours for a culvert replacement.

The road improvements are expected to take approximately three days to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT:  If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 09/04/25

August 28, 2025 Daytime Road Closure: Dixboro Rd (Salem Twp)

WHEN: Thursday September 4, 2025

WHERE: Dixboro Rd between Pontiac Trail Rd and North Territorial Rd in Salem Township

WHY: Culvert Replacement

BACKGROUND: On Thursday September 4, 2025, expect daytime road closures on Dixboro Rd between Pontiac Trail Rd and North Territorial Rd in Salem Township for a culvert replacement.

The road improvements are expected to take approximately two days to complete. During this daytime roadwork through-traffic will be prohibited, and alternate routes are advised. Local access for properties within the road closure will be maintained, however, delays are possible.

The Washtenaw County Road Commission (WCRC) reminds everyone to be especially mindful of construction equipment, personnel, and reduce speeds accordingly. WCRC thanks you in advance for your patience as we continue our efforts to preserve the county road system.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/28/25

August 19, 2025 Road Reopened: 5 Mile Rd (Salem Twp)

WHEN: Tuesday, August 19, 2025

WHERE: 5 Mile Rd between Curtis Rd and Currie Rd in Salem Township

WHY: Drainage work–completed

BACKGROUND:  On Tuesday, August 19, 2025, the Washtenaw County Road Commission (WCRC) reopened 5 Mile Rd between Curtis Rd and Currie Rd in Salem Township.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/19/25

August 19, 2025 Daytime Road Closure: 5 Mile Rd (Salem Twp)

WHEN: Tuesday, August 19, 2025

WHERE: 5 Mile Rd between Curtis Rd and Currie Rd in Salem Township

 WHY: Drainage work

 BACKGROUND: On Tuesday, August 19, 2025, the Washtenaw County Road Commission (WCRC) will close 5 Mile Rd between Curtis Rd and Currie Rd in Salem Township for drainage work.

The road improvements are expected to take approximately one day to complete. However, all dates are tentative and subject to change due to weather conditions.

During these daytime activities through-traffic will be prohibited, and alternate routes are advised. Local access for properties within the road closure will be maintained, however, delays are possible.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

 ISSUE DATE: 08/19/25

August 18, 2025 Daytime Road Closure: Currie Rd (Salem Twp)

WHEN: Monday, August 18, 2025

WHERE: Currie Rd between 5 Mile Rd and 6 Mile Rd in Salem Township

WHY: Drainage work

BACKGROUND: On Monday, August 18, 2025, the Washtenaw County Road Commission (WCRC) will close Currie Rd between 5 Mile Rd and 6 Mile Rd in Salem Township for drainage work.

The road improvements are expected to take approximately one day to complete. However, all dates are tentative and subject to change due to weather conditions.

During these daytime activities through-traffic will be prohibited, and alternate routes are advised. Local access for properties within the road closure will be maintained, however, delays are possible.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/18/25

August 13, 2025 Daytime Road Closure: Salem Rd (Salem Twp)

WHEN: Tuesday, August 19, 2025

WHERE: Salem Rd between 5 Mile Rd and the End of Pavement in Salem Township

WHY: Limestone resurfacing

BACKGROUND: On Tuesday, August 19, 2025, the Washtenaw County Road Commission (WCRC) will close Salem Rd between 5 Mile Rd and the End of Pavement in Salem Township during daytime hours for limestone resurfacing.

The road improvements are expected to take approximately three days to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Jared Powers, Assistant Superintendent of Operations, (734) 327-6650, or via email at [email protected]

ISSUE DATE: 08/13/25

August 13, 2025 Daytime Road Closure: Salem Rd (Salem Twp)

WHEN: Thursday, August 14, 2025

WHERE: Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township

WHY: Limestone resurfacing

BACKGROUND: On Thursday, August 14, 2025, the Washtenaw County Road Commission (WCRC) will close Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township during daytime hours for limestone resurfacing.

The road improvements are expected to take approximately one week to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Jared Powers, Assistant Superintendent of Operations, (734) 327-6650, or via email at [email protected]

ISSUE DATE: 08/13/25

August 7, 2025 Road Reopen: Salem Rd (Salem Twp)

WHEN: Thursday, August 7, 2025

WHERE: Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township

WHY: Culvert replacement-completed

BACKGROUND: On Thursday, August 7, 2025, the Washtenaw County Road Commission (WCRC) will reopen Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/07/25

August 7, 2025 Road Closure: Salem Rd (Salem Twp)

WHEN: Thursday, August 7, 2025

WHERE: Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township

WHY: Culvert replacement

BACKGROUND: On Thursday August 7, 2025, the Washtenaw County Road Commission (WCRC) will close Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township for a culvert replacement.

The road improvements are expected to take approximately one day to complete. However, all dates are tentative and subject to change due to weather conditions.

During these daytime activities through-traffic will be prohibited, and alternate routes are advised. Local access for properties within the road closure will be maintained, however, delays are possible.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/07/25

August 7, 2025 Road Reopen: Salem Rd (Salem Twp)

WHEN: Thursday, August 7, 2025

WHERE: Salem Rd between 5 Mile Rd and 6 Mile Rd in Salem Township

WHY: Culvert replacement-completed

BACKGROUND: On Thursday, August 7, 2025, the Washtenaw County Road Commission (WCRC) will reopen Salem Rd between 5 Mile Rd and 6 Mile Rd in Salem Township.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/07/25

August 7, 2025 Daytime Road Closure: Salem Rd (Salem Twp)

WHEN: Thursday, August 7, 2025

WHERE: Salem Rd between 5 Mile Rd and 6 Mile Rd in Salem Township

WHY: Culvert replacement

BACKGROUND: On Thursday August 7, 2025, the Washtenaw County Road Commission (WCRC) will close Salem Rd between 5 Mile Rd and 6 Mile Rd in Salem Township for a culvert replacement.

The road improvements are expected to take approximately one day to complete. However, all dates are tentative and subject to change due to weather conditions.

During these daytime activities through-traffic will be prohibited, and alternate routes are advised. Local access for properties within the road closure will be maintained, however, delays are possible.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/07/25

August 6, 2025 Intermittent Lane Closures: 6 Mile Rd (Salem Twp)

WHEN: Wednesday, August 6, 2025

WHERE: 6 Mile Rd between Currie Rd and Chubb Rd in Salem Township

WHY: Permit work: Storm Drain Reconstruction

BACKGROUND: On Wednesday, August 6, 2025, a contractor from Salem Township will be performing permit work on 6 Mile Rd between Currie Rd and Chubb Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to intermittent lane closures. WCRC encourages motorists, emergency services and others to use an alternate route.

The road improvements are expected to take five months to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Steve Roberts, Salem Township, (248) 912-6722, or via email at [email protected]

ISSUE DATE: 08/06/25

July 31, 2025 Intermittent Lane Closures: Salem Rd (Salem Twp)

WHEN: Thursday, August 7, 2025

WHERE: Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township

WHY: Forestry work

BACKGROUND:  On Thursday August 7, 2025, the Washtenaw County Road Commission (WCRC) will be performing forestry work on Salem Rd between Brookville Rd and 5 Mile Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to intermittent lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The forestry work is expected to take nine days to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Jared Powers, Assistant Superintendent of Operations, (734) 327-6650, or via email at [email protected]

ISSUE DATE: 07/31/25

July 28, 2025 Intermittent Lane Restrictions: Salem Rd (Salem Twp)

WHEN: Monday, July 28, 2025

WHERE: Salem Rd between Brookville Rd and Macedonia Ln in Salem Township

WHY: Drainage work

BACKGROUND: On Monday, July 28, 2025, the Washtenaw County Road Commission (WCRC) will be performing drainage work on Salem Rd between Brookville Rd and Macedonia Ln in Salem Township.

The road will not be closed to traffic, but delays are likely due to intermittent lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The drainage work is expected to take eleven days to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696 or via email at [email protected].

ISSUE DATE: 07/28/25

June 18, 2025 Project Announcement: Dixboro Road at Pontiac Trail Roundabout (Salem, Northfield Twps)

Big improvements are on the horizon for drivers in Salem and Northfield Townships: the intersection of Dixboro Road and Pontiac Trail is getting a major upgrade. The Washtenaw County Road Commission (WCRC) is transforming this busy intersection into a modern roundabout—designed to enhance safety, ease traffic delays, and support environmental goals. 

Thanks to a $1.2 million federal Carbon Reduction Program grant awarded in 2023, construction is slated to begin in 2026. 

“The Washtenaw County Road Commission’s top priority is making sure everyone gets where they need to go safely—whether you’re driving your kids to school, commuting to work, or running errands,” said Jane Allen, WCRC Project Manager. “This roundabout will help reduce serious crashes and make the intersection safer and less stressful for everyone who travels through it as well as reducing carbon emissions by cutting down idling times at stop signs” 

Roundabouts help: 

  • Improve traffic flow by reducing delays during peak travel times. 
  • Enhance safety by lowering vehicle speeds and eliminating high-speed crossing conflicts. 
  • Support sustainability goals by reducing vehicle idling and fuel consumption. 

WCRC routinely monitors intersections throughout the county to identify opportunities for improvement. Dixboro Rd at Pontiac Trail stood out due to growing congestion during peak hours. WCRC decided to install a roundabout at Dixboro and Pontiac Trail over a traditional signalized intersection since their continuous-flow design decreases commute times and lowers long-term maintenance costs.  There is also an added safety benefit since roundabouts have been shown to reduce injury crashes by up to 75% and nearly eliminate fatal crashes.  

To complete the project safely and efficiently, the intersection will be fully closed to all traffic during construction. A clearly marked detour will be posted, and WCRC will share updates with the community throughout the process. 

A virtual public information meeting will be held in Fall 2025, giving residents and travelers a chance to learn more and ask questions. 

For more information, visit the project web page here. You can also sign up for WCRC project updates here. 

For questions about this project, contact Jane Allen, Project Manager, at (734) 327-6691 or [email protected]. 

Pictured above is the intersection of Dixboro Rd and Pontiac Trail in Salem and Northfield Townships.

May 30, 2025 Intermittent Lane Restrictions: 8 Mile Rd (Salem Twp)

WHEN: Monday, June 2, 2025

WHERE: 8 Mile Rd between Pontiac Trail and Currie Rd in Salem Township

WHY: Preventative maintenance – chip seal

BACKGROUND: On Monday, June 2, 2025, the Washtenaw County Road Commission (WCRC) will begin a preventative maintenance chip seal project on 8 Mile Rd between Pontiac Trail and Currie Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to intermittent lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The chip seal work is expected to take a week, and the remaining maintenance work will be completed in the coming weeks. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696 or via email at [email protected].

ISSUE DATE: 05/30/25

May 30, 2025 Intermittent Lane Restrictions: Pontiac Trail (Salem Twp)

WHEN: Tuesday, June 3, 2025

WHERE: Pontiac Trail between 7 Mile Rd and 8 Mile Rd in Salem Township

WHY: Preventative maintenance – chip seal

BACKGROUND: On Tuesday, June 3, 2025, the Washtenaw County Road Commission (WCRC) will begin a preventative maintenance chip seal project on Pontiac Trail between 7 Mile Rd and 8 Mile Rd in Salem Township.

The road will not be closed to traffic, but delays are likely. WCRC encourages motorists, emergency services and others to use an alternate route.

The chip seal work is expected to take two business days, and the remaining maintenance work will be completed in the coming weeks. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696 or via email at [email protected].

ISSUE DATE: 05/30/25

May 20, 2025 Road Reopened: Chubb Rd (Salem Twp)

WHEN: Tuesday, May 20, 2025

WHERE: Chubb Rd between 7 Mile Rd and 8 Mile Rd in Salem Township

WHY: Culvert Replacement – complete

BACKGROUND: On Tuesday, May 20, 2025, the Washtenaw County Road Commission (WCRC) reopened Chubb Rd between 7 Mile Rd and 8 Mile Rd in Salem Township.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 05/20/25

May 19, 2025 Daytime Road Closure: Chubb Rd (Salem Twp)

WHEN: Tuesday, May 20, 2025

WHERE: Chubb Rd between 7 Mile Rd and 8 Mile Rd in Salem Township

WHY: Culvert Replacement

BACKGROUND: On Tuesday, May 20, 2025, the Washtenaw County Road Commission (WCRC) will replace a culvert on Chubb Rd between 7 Mile Rd and 8 Mile Rd in Salem Township.

The road improvements are expected to take approximately one day to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 05/19/25

May 8, 2025 Intermittent Lane Restrictions – Curtis Rd (Salem & Superior Twps)

WHEN: Monday, May 12, 2025

WHERE: Curtis Rd between Plymouth Rd and Joy Rd in Salem and Superior Townships

WHY: Drainage

BACKGROUND: On Monday, May 12, 2025, the Washtenaw County Road Commission (WCRC) will be performing drainage work on Curtis Rd between Plymouth Rd and Joy Rd in Salem and Superior Townships.

The road will not be closed to traffic, but delays are likely due to intermittent lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The road improvements are expected to take two days to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 05/08/25

May 1, 2025 Intermittent Lane Restrictions – Various Locations (Countywide)

WHEN: Monday, May, 2025

WHERE: Various Locations, Countywide

WHY: Sweeping of State Trunk Line Roads

BACKGROUND: On Monday, May 5, 2025, the Washtenaw County Road Commission (WCRC) will be sweeping State Trunk Line roads in various locations countywide.

The road will not be closed to traffic, but delays are likely due to intermittent lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route,

The road improvements are expected to be within a week. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Jared Powers, Assistant Superintendent of Maintenance, (734) 327-6650, or via email at [email protected]

ISSUE DATE: 05/01/25

September 28, 2024 Intermittent Lane Restrictions: Brookville Rd (Salem Twp)

WHEN: Monday, September 30, 2024

WHERE: Brookville Rd between Salem Rd and Gotfredson Rd in Salem Township

WHY: Drainage work

BACKGROUND: On Monday, September 30, 2024, the Washtenaw County Road Commission (WCRC) will perform drainage work on Brookville Rd between Salem Rd and Gotfredson Rd in Salem Township under intermittent daily lane restrictions. Motorists should expect delays in the area.

The drainage work is expected to take approximately one week to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 09/28/24

September 7, 2024 Lane Restrictions: Dixboro Rd (Northfield and Salem Twps.)

WHEN: Monday, September 9, 2024

WHERE: Dixboro Rd between 5 Mile Rd and 6 Mile Rd in Northfield and Salem Townships

WHY: Drainage work

BACKGROUND: On Monday, September 9, 2024, the Washtenaw County Road Commission (WCRC) continues to perform drainage work on Dixboro Rd between 5 Mile Rd and 6 Mile Rd in Northfield and Salem Townships.

The road is not closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The drainage work is expected to take an additional week to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 09/07/24

August 22, 2024 Lane Restrictions: Dixboro Rd (Northfield and Salem Twps.)

WHEN: Monday, August 26, 2024

WHERE: Dixboro Rd between 5 Mile Rd and 6 Mile Rd in Northfield and Salem Townships

WHY: Drainage work

BACKGROUND: On Monday, August 26, 2024, the Washtenaw County Road Commission (WCRC) will perform drainage work on Dixboro Rd between 5 Mile Rd and 6 Mile Rd in Northfield and Salem Townships.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The drainage work is expected to take approximately two days to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/22/24

August 15, 2024 Lane Restrictions: Brookville Rd (Salem Twp)

WHEN: Thursday, August 22, 2024

WHERE: Brookville Rd between Gotfredson Rd and Salem Rd in Salem Township

WHY: Forestry

BACKGROUND: On Thursday, August 22, 2024, the Washtenaw County Road Commission (WCRC) will be performing forestry work on Brookville Rd between Gotfredson Rd and Salem Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The forestry work is expected to take approximately five days. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this project, please contact Jared Powers, Assistant Superintendent of Maintenance, (734) 327-6650 or [email protected].

ISSUE DATE: 08/15/24

July 29, 2024 REVISED Lane Restrictions: Chubb Rd (Salem Twp)

WHEN: Tuesday, July 30, 2024

WHERE: Chubb Rd between 7 Mile Rd and 8 Mile Rd in Salem Township

WHY: Drainage work

BACKGROUND: On Tuesday, July 30, 2024, the Washtenaw County Road Commission (WCRC) will begin drainage work on Chubb Rd between 7 Mile Rd and 8 Mile Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The drainage work is expected to take approximately two weeks. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 07/29/24

July 26, 2024 Project Update #2 – 7 Mile Rd Resurfacing (Salem Twp)

Our resurfacing project on 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township is progressing.  

Since the last update, the contractor has been able to finish paving the leveling course (first layer of asphalt) and the wearing course (last layer of asphalt) throughout the project limits. The next step is placing aggregate (stone) shoulders and permanent pavement markings. Grade for gravel driveways within the project limits will be addressed during the placement of aggregate shoulders. The Washtenaw County Road Commission (WCRC) will continue to send out updates as the project progresses.  

Have questions about the project? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected]

Pictured above is the new surface of 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Twp.
July 25, 2024 Lane Restrictions: Dixboro Rd (Northfield & Salem Twps)

WHEN: Monday, July 29, 2024

WHERE: Dixboro Rd between 5 Mile Rd and 6 Mile Rd in Northfield and Salem Townships

WHY: Drainage work

BACKGROUND: On Monday, July 29, 2024, the Washtenaw County Road Commission (WCRC) will begin drainage work on Dixboro Rd between 5 Mile Rd and 6 Mile Rd in Northfield and Salem Townships.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The drainage work is expected to take approximately two weeks. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 07/25/24

July 25, 2024 Lane Restrictions: 7 Mile Rd (Salem Twp)

WHEN: Monday, July 29, 2024

WHERE: 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township

WHY: Aggregate shoulder placement

BACKGROUND: During the week of Monday, July 29, 2024, the Washtenaw County Road Commission (WCRC) will place aggregate (stone) shoulders on 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The road work is expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]

ISSUE DATE: 07/25/24

July 24, 2024 Road Reopened: 7 Mile Rd (Salem Twp)

WHEN: Wednesday, July 24, 2024

WHERE: 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township

WHY: Completion of road resurfacing project

BACKGROUND: On Wednesday, July 24, 2024, the Washtenaw County Road Commission (WCRC) re-opened 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township.

CONTACT: If you have any questions concerning this project, please contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].

ISSUE DATE: 07/24/24

July 21, 2024 Project Update #1 – 7 Mile Rd Resurfacing (Salem Twp)

Our resurfacing project on 7 Mile Rd between Pontiac Tr and Angel Rd in Salem Township is going well!

On Tuesday, July 16, 2024, we closed to the road to begin crushing the existing pavement (pulverizing) to create a new road base. The contractor has completed pulverizing throughout 7 Mile Rd between Pontiac Tr and Angel Rd in Salem Township expects to begin paving the week of July 22.  Paving will take a few days to finish. Once completed, next step will be adding aggregate (stone) shoulders and pavement markings.

The Washtenaw County Road Commission (WCRC) will send out updates as the project progresses. Have questions? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].

Pictured above is the pulverizer machine crushing and shaping the existing road surface on 7 Mile Rd between Pontiac Tr and Angel Rd in Salem Township.
July 16, 2024 Lane Restrictions: Pontiac Tr (Salem Twp)

WHEN: Wednesday, July 17, 2024

WHERE: Pontiac Tr between N. Territorial Rd and 7 Mile Rd in Salem Township

WHY: Crack sealing

BACKGROUND: The Washtenaw County Road Commission (WCRC) will perform crack sealing on Pontiac Tr between N. Territorial Rd and 7 Mile Rd in Salem Township between Wednesday, July 17, and Wednesday, July 31, 2024.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The roadwork is expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Michele Ford, Sr. Project Manager – Traffic & Safety, (734) 327-6652, or via email at [email protected]

ISSUE DATE: 07/16/24

July 15, 2024 Lane Restrictions: 7 Mile Rd (Salem Twp)

WHEN: Monday, July 15, 2024

WHERE: 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township

WHY: Drainage work

BACKGROUND: On Monday, July 15, 2024, the Washtenaw County Road Commission (WCRC) will begin drainage work on 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The road improvements are expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]

ISSUE DATE: 07/15/24

July 15, 2024 REVISED Road Closure with Detour: 7 Mile Rd (Salem Twp)

WHEN: Tuesday, July 16, 2024

WHERE: 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township

WHY: Road resurfacing

BACKGROUND: On Tuesday, July 16, 2024, The Washtenaw County Road Commission (WCRC) will close 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township for a road resurfacing project.

The roadwork is expected to take approximately two weeks. However, all dates are tentative and subject to change due to weather conditions.

Access will be maintained for any residents who work or live within the closure limits.

DETOUR: Click here for the detour map.

CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]

ISSUE DATE: 07/15/24

June 5, 2024 Hybrid Informational Session: Renew & Restore County-wide Roads & Non-motorized Millage

Washtenaw County, Wednesday, June 5, 2024 The Washtenaw County Road Commission (WCRC) and the Washtenaw County Parks and Recreation Commission (WCPARC) invites the public to a hybrid informational session on Monday, June 24, 2024, at 11:30 a.m. to learn more about the renew and restore 0.5 mill four-year county-wide roads and non-motorized millage (Proposal A). WCRC encourages residents to join the conversation either in person or in a Zoom meeting. 

  • Event: Renew & Restore Roads & Non-motorized Millage Informational Session
  • Date:   Monday, June 24, 2024
  • Time:  11:30 a.m.
  • In-person: Washtenaw County Road Commission, 555 North Zeeb Road, Ann Arbor, Michigan 48103 
  • Zoom Link: https://bit.ly/wcrcprojectmeeting , or by phone: (929) 205-6099, Meeting ID: 879 2332 8754

Washtenaw County voters are being asked on the August 6, 2024, ballot to renew and restore the 0.5 mill four-year county-wide roads and non-motorized millage (Washtenaw County Proposal A). This is not a new tax for voters. If renewed and restored, the 0.5 mill is expected to generate approximately $10.9 million per year for roads and non-motorized pathway projects. WCRC would receive approximately $4.9 million per year for road work in 20 townships, Cities would receive approximately $3.8 million per year, with specific allocations based on the amount raised within cities borders, and WCPARC would receive approximately $2.2 million per year to support the expansion of the county non-motorized path network through the Border-to-Border Trail Project (B2B Trail) and the Connecting Communities Grant Program.  

“Since its inception a decade ago, the county-wide roads and non-motorized millage has consistently delivered on its promise to improve the roadways, bridges, and non-motorized pathways in Washtenaw County,” said Matthew MacDonell, Managing Director of Washtenaw County Road Commission. “Through strategic investments and careful planning, we have witnessed significant progress in addressing the condition of our critical infrastructure.” 

“The Roads and Non-motorized Millage is a testament to the power of collective action and community investment. As we look towards the future, we are confident that our continued partnership with WCRC, Township, and City leaders and residents will enable us to build upon past successes and pave the way for a brighter, more resilient tomorrow,” said Coy Vaughn, Director of Washtenaw County Parks & Recreation Commission. 

More than 70% of county voters approved of the four-year, 0.5 mill roads and non-motorized millages in 2016 and 2020. With widespread support from our residents, the proposed Roads and Non-motorized Millage has consistently demonstrated its effectiveness in addressing the needs of our community. 

The Roads and Non-motorized Millage have been a vital lifeline for our community, providing the necessary resources to improve our road infrastructure and non-motorized pathways, says Chuck Tellas, Supervisor for York Township. Our Township remains committed to working collaboratively with WCRC and WCPARC to ensure that our roads and non-motorized facilities remain safe, accessible, and well-maintained for the future.” 

Visit https://bit.ly/washtenawroadandpathmillage to learn more. 

Contact: Tiffany Oliphant, Communications Manager, Washtenaw County Road Commission 

[email protected] / (734) 327-6646 

Contact: Ann M. Ziolkowski, Communications Manager, Washtenaw County Parks & Recreation Commission 

[email protected]/ (734) 971-6337 

### 

Washtenaw County Parks & Recreation Commission (WCPARC)
The Washtenaw County Parks & Recreation Commission, founded in 1973, currently manages 12 parks and 37 nature preserves totaling more than 6,700 acres. Washtenaw County Parks provides recreational and nature-based programming. Visit us at washtenaw.org/parks on Facebook and Instagram, or call (734) 971-6337.   

Washtenaw County Road Commission (WCRC)
The Washtenaw County Road Commission, founded in 1919, maintains approximately 1,650 miles of certified public roads. All public roads in Washtenaw County located outside of city and village limits are maintained by WCRC crews. Visit us at wcroads.org, @washtenawroads on Facebook, Instagram and X/Twitter, or call (734) 761-1500. 

May 14, 2024 Safety Improvement Update: Six Mile Rd in Salem Twp

The Washtenaw County Road Commission (WCRC) is improving safety at the intersection of Six Mile Road and Currie Road in Salem Township.

The intersection of Six Mile Road and Currie Road in Salem Township is now an all-way stop, also known as a four-way stop. The intersection was recently converted from a two-way stop with Six Mile Rd traffic having the right-of-way.

Based upon the Michigan Manual on Uniform Traffic Control Devices (MMUTCD) this intersection met the criteria to become a multi-way stop. The modification will improve the safety of the intersection. Motorists are reminded of the need for additional caution through the intersection since the change has been implemented.

If you have any questions concerning his project, contact Michele Ford, Sr. Project Manager – Traffic & Safety, at (734) 327-6652, or via email at [email protected].

Pictured above is the four-way stop at the intersection of and Six Mile Rd and Currie Rd in Salem Township.

May 8, 2024 Safety Improvement Project on Six Mile Rd in Salem Twp

The Washtenaw County Road Commission (WCRC) is improving safety at the intersection of Six Mile Road and Currie Road in Salem Township, next week.

The week of May 13, 2024, the intersection of Six Mile Rd and Currie Rd in Salem Township will be converted to an all-way stop, also known as a four-way stop. Currently, the intersection is a two-way stop with Six Mile Rd traffic having the right-of-way.

The purpose for the change is that through our evaluation of the intersection it was determined that warrants were met for a multi-way stop based on the Michigan Manual on Uniform Traffic Control Devices (MMUTCD). The modification will improve the safety of the intersection. Weather permitting, the conversion will be implemented the week of May 13th. Warning signs will be installed in advance of the new stop signs to alert motorists of the change.

Motorists are reminded of the need for additional caution through the intersection once the change has been implemented.

If you have any questions concerning his project, contact Michele Ford, Sr. Project Manager – Traffic & Safety, at (734) 327-6652, or via email at [email protected].

Pictured above is the current condition of the intersection of Six Mile Rd and Currie Rd in Salem Township that will be changed to an all-way stop.

April 5, 2024 Lane Restrictions: 7 Mile Rd (Salem Twp)

WHEN: Monday, April 8, 2024

WHERE: 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township

WHY: Forestry work

BACKGROUND: On Monday, April 8, 2024, the Washtenaw County Road Commission (WCRC) will begin forestry work on 7 Mile Rd between Pontiac Tr and Angle Rd in Salem Township.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The forestry work is expected to take approximately five days. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 04/05/24

March 19, 2024 Virtual Public Meeting: 2024 Resurfacing Program (County-wide)

PROJECT: 2024 County-wide Resurfacing Program

WHEN: Thursday, April 4, 2024, at 11 a.m.

WHERE: Online: https://bit.ly/wcrcprojectmeeting

By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754

WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the planned County-wide Resurfacing Program taking place during the 2024 construction season.

During construction, traffic will be maintained under lane restrictions and flagging operations. During specific construction activities, the road may be closed, and a detour will be posted. WCRC estimates it will take approximately two/three weeks, on average, to complete each project, weather pending.

The virtual public meeting will be held via Zoom Thursday, April 4, 2024, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.

Click here to learn more about joining the virtual meeting.

CONTACT: If you have any questions concerning this project, please contact Mike Bernbeck, Project Manager, at (734) 327-6654, or via email at [email protected].

WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].

ISSUE DATE: 03/19/24

March 15, 2024 Project Announcement: 2024 Resurfacing Program (County-wide)

The Washtenaw County Road Commission (WCRC) is announcing plans to invest $6.7 million to improve approximately 20 lane miles of pavement throughout Washtenaw County during the 2024 construction season. Cadillac Asphalt was awarded the contract. The projects are funded through the 2021-2024 Four-year County-wide Roads and Non-Motorized Millage, federal funds and Michigan Transportation Funds (MTF).

“Most of these investments are made possible by Washtenaw County residents who travel on these roads every day. As stewards of these precious dollars, WCRC is committed to ensuring these resources are reinvested into communities, in which it came from,” said Mike Bernbeck, WCRC Project Manager.

Construction will begin mid-April and will end during the fall of 2024, weather pending. Listed below are the project locations with a link to their project web page, funding cost and traffic impacts:

Motorists will experience road closures with detours, lane restrictions, and flagging operations. WCRC will maintain access for residents who live or work within the project limits during construction.

WCRC will host a virtual public information meeting regarding the County-wide Resurfacing projects in Spring 2024. WCRC will post project updates online at wcroads.org. Residents can subscribe to road work advisories and project updates here.

For specific questions on this project, contact Mike Bernbeck, Project Manager, (734) 327-6654 or [email protected].

Pictured is a map of our 2024 County-wide Resurfacing Program.

February 5, 2024 Weight Restrictions: 6 Mile Rd, over Rouge River Trib (Salem Twp)

WHEN: Effective Friday, February 2, 2024

WHERE: 6 Mile Rd, over Rouge River Trib, between Salem Rd and Chubb Rd in Salem Township

WHY: Structural deterioration

BACKGROUND: Effective Friday, February 2, 2024, the Washtenaw County Road Commission (WCRC) has reduced the load rating on the following structure due to structural deterioration:

 6 Mile Rd, over Rouge River Trib, between Salem Rd and Chubb Rd in Salem Township reduced to 36/55/65.

A schedule for maintenance at this location is undetermined.

CONTACT: If you have any questions concerning these structures, please contact Nate Murphy, bridge engineer, at (734) 327-6647 or [email protected].

Click here to learn more about WCRC’s bridge restrictions.

ISSUE DATE: 02/05/24

Washtenaw County Road Commission
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.