Location of roadwork:
Huron River Dr between Huron Rd and Textile Rd
Township:
Ypsilanti
When is the work being done:
June 7, 2024
Description of work:
Mill & Resurfacing
Impact on Traffic:
Lane Restrictions and Flagging Operation
Funding Source(s):
Federal, Michigan Transportation Fund (MTF)
Latest Updates
Our asphalt resurfacing project on Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township is nearly complete!
Since the last update, the contractor completed milling the existing surface of the roadway. Paving operations were delayed by one day due to contractor scheduling. Paving operations began on Tuesday, June 11, and are expected to be completed tomorrow, Thursday, June 13. Once paving is finished, aggregate (stone) shoulders will be placed, and traffic restrictions will be lifted.
The schedule for pavement markings is still yet to be determined. In the meantime, temporary pavement markings will be placed. Have questions about the project? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].
Pictured are the paving operations that are taking place on Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township.
Our resurfacing project on Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township is moving along!
On Friday, June 7, a contractor for the Washtenaw County Road Commission (WCRC) began milling the existing surface of the roadway. Tomorrow, paving operations will begin throughout the project limits. Paving is expected to take approximately three days to complete, pending weather conditions. Next step is placing pavement markings and aggregate (stone) shoulders.
WCRC will send out updates as the project progresses. Have questions? Contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected].
Pictured above is the milled surface of Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township.
WHEN: Friday, June 7, 2024
WHERE: Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township
WHY: Road resurfacing
BACKGROUND: On Friday, June 7, 2024, the Washtenaw County Road Commission (WCRC) will begin a resurfacing project on Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township.
The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The road improvements are expected to take approximately two weeks. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]
ISSUE DATE: 06/03/24
WHEN: Wednesday, May 29, 2024
WHERE: Huron River Dr between Huron Rd and Tuttle Hill Rd in Ypsilanti Township
WHY: Culvert replacement
BACKGROUND: On Wednesday, May 29, 2024, the Washtenaw County Road Commission (WCRC) will close Huron River Dr between Huron Rd and Tuttle Hill Rd in Ypsilanti Township to replace a crossroad culvert.
The road improvements are expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.
DETOUR: Click here for the detour map.
CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 05/23/24
WHEN: Monday, April 15, 2024
WHERE: Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township
WHY: Drainage & forestry work
BACKGROUND: On Monday, April 15, 2024, the Washtenaw County Road Commission (WCRC) will begin drainage and forestry work on Huron River Dr between Huron Rd and Textile Rd in Ypsilanti Township.
The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The roadwork is expected to take approximately three weeks. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 04/11/24
PROJECT: 2024 County-wide Resurfacing Program
WHEN: Thursday, April 4, 2024, at 11 a.m.
WHERE: Online: https://bit.ly/wcrcprojectmeeting
By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754
WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the planned County-wide Resurfacing Program taking place during the 2024 construction season.
During construction, traffic will be maintained under lane restrictions and flagging operations. During specific construction activities, the road may be closed, and a detour will be posted. WCRC estimates it will take approximately two/three weeks, on average, to complete each project, weather pending.
The virtual public meeting will be held via Zoom Thursday, April 4, 2024, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.
Click here to learn more about joining the virtual meeting.
CONTACT: If you have any questions concerning this project, please contact Mike Bernbeck, Project Manager, at (734) 327-6654, or via email at [email protected].
WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].
ISSUE DATE: 03/19/24
The Washtenaw County Road Commission (WCRC) is announcing plans to invest $6.7 million to improve approximately 20 lane miles of pavement throughout Washtenaw County during the 2024 construction season. Cadillac Asphalt was awarded the contract. The projects are funded through the 2021-2024 Four-year County-wide Roads and Non-Motorized Millage, federal funds and Michigan Transportation Funds (MTF).
“Most of these investments are made possible by Washtenaw County residents who travel on these roads every day. As stewards of these precious dollars, WCRC is committed to ensuring these resources are reinvested into communities, in which it came from,” said Mike Bernbeck, WCRC Project Manager.
Construction will begin mid-April and will end during the fall of 2024, weather pending. Listed below are the project locations with a link to their project web page, funding cost and traffic impacts:
Motorists will experience road closures with detours, lane restrictions, and flagging operations. WCRC will maintain access for residents who live or work within the project limits during construction.
WCRC will host a virtual public information meeting regarding the County-wide Resurfacing projects in Spring 2024. WCRC will post project updates online at wcroads.org. Residents can subscribe to road work advisories and project updates here.
For specific questions on this project, contact Mike Bernbeck, Project Manager, (734) 327-6654 or [email protected].
Pictured is a map of our 2024 County-wide Resurfacing Program.