Tyler Rd

Location of roadwork:
Tyler Rd between McGregor Rd and Airport Rd in Ypsilanti Township

Township:
Ypsilanti

When is the work being done:
2025

Description of work:
Road Reconstruction

Impact on Traffic:
Road Closure

Funding Source(s):
Michigan Transportation Fund (MTF)

Latest Updates

April 23, 2025 Project Update #5 – Tyler Rd Reconstruction (Ypsilanti Twp)

The Washtenaw County Road Commission (WCRC) Contractor is continuing to make progress on the Tyler Road project between McGregor Road and Airport Road in Ypsilanti Township.

Recently, the Contractor connected the storm sewer system into the bridge structure to promote efficient drainage during rain events. This two-day operation involved careful drilling and close monitoring of the structural integrity of the bridge.

Construction crews also prepared the nearby slope (previously washed out) for a new erosion control system. This system includes a durable cellular grid to promote slope stability during heavy rain events. The slope work began on Wednesday, April 23.

Next week, the Contractor plans to begin constructing the road base and installing storm drainage spillways at the east end of the project.

WCRC will continue to send out updates as the project progresses. Have questions? Contact Neeko Robison, Project Manager – Design & Construction, (734) 327-6660, or via email at [email protected].

Pictured above: The Contractor tapping the Tyler Rd Bridge to outlet stormwater drainage under the bridge and installing slope stabilizing materials.

April 11, 2025 Project Update #4 – Tyler Rd Reconstruction Project (Ypsilanti Twp)

This week, WCRC’s contractor installed upgraded stormwater systems around the dam. WCRC also worked on upgrading drainage along Tyler Rd, North and East of the project site to divert flow away from the dam in the future.

Next week, the contractor will clean up the ditch left behind by the initial rain event and prepare the area for installation of a geocellular confinement system on the ridge adjacent to the dam.

WCRC will continue to send out updates as the project progresses. Have questions? Contact Neeko Robison, Project Manager – Design & Construction, (734) 327-6660, or via email at [email protected] 
April 2, 2025 Project Update #3 – Tyler Rd Road Reconstruction Project (Ypsilanti Twp)

This week, WCRC’s contractor focused on protecting the site from several rain events. The washout being repaired was caused by outdated stormwater collection systems, so the contractor reinforced the open excavations with additional ditching and other preventative measures. They also worked on removing abandoned utilities from the washout area. 

The photo below shows laborers licensed in handling the removal of asbestos; a material commonly used during the initial construction of the dam. The pipe was safely and successfully removed. Additionally, WCRC’s contractor began installing upgraded stormwater systems with work to continue into the week of April 7. 

WCRC will continue to send out updates as the project progresses. Have questions? Contact Neeko Robison, Project Manager – Design & Construction, (734) 327-6660, or via email at [email protected] 
March 28, 2025 Project Update #2 – Tyler Rd Road Reconstruction Project (Ypsilanti Twp)

This week, the contractor focused on demolition of the existing roadway, clearing the washout area, and removing the guardrail. They are also preparing to remove the abandoned utilities.

In the image below, the contractor is seen placing backfill, with compaction testing being conducted by a third-party firm. The objective is to establish a stable foundation for the removal of the abandoned utilities scheduled for early next week.

WCRC will continue to send out updates as the project progresses. Have questions? Contact Neeko Robison, Project Manager – Design & Construction, (734) 327-6660, or via email at [email protected].

March 18, 2025 Project Update #1 – Tyler Rd Road Reconstruction Project (Ypsilanti Twp)

On Tuesday, March 18, 2025, a contractor for the Washtenaw County Road Commission (WCRC) started repairs on Tyler Rd (between McGregor Rd and Airport Rd) in Ypsilanti Township. The work here is to clear the washout under the road which first occurred in 2023, and to repair the road above.

The contractor will begin with demolition of the surrounding road followed by the installation of a new storm system. 

WCRC will continue to send out updates as the project progresses. Have questions? Contact Neeko Robison, Project Manager – Design & Construction, (734) 327-6660, or via email at [email protected].
Pictured above, is WCRC’s contractor mobilizes equipment in preparation for the repairs on Tyler Rd in Ypsilanti Twp. 
August 24, 2023 Road Closure: Tyler Rd (Ypsilanti Twp)

WHEN: Thursday, August 24, 2023

WHERE: Tyler Rd between McGregor Rd and Airport Rd in Ypsilanti Township

WHY: Road wash out

BACKGROUND: On Thursday, August 24, 2023, the Washtenaw County Road Commission (WCRC) closed Tyler Rd between McGregor Rd and Airport Rd in Ypsilanti Township due to a road wash out after a weather event. WCRC staff is evaluating the situation and coordinating with the Washtenaw County Water Resource Commission (WCWRC) and Ypsilanti Community Utility Authority (YCUA).

WCRC will notify the public when the road is reopened. WCRC encourages motorists, emergency services and others to use an alternate route.

CONTACT: If you have any questions concerning this emergency closure, please contact Adam Lape, Director of Operations at (734) 327-6697.

Picture: Tyler Rd between McGregor Rd and Airport Rd in Ypsilanti Township

 