Location of roadwork:
Dixboro Rd between Plymouth Rd and M-14
When is the work being done:
June 17, 2024
Description of work:
Pulverize & Rehabilitate
Impact on Traffic:
Road Closure with Detour
Funding Source(s):
Four-Year Road and Non-Motorized Path Millage, Michigan Transportation Fund (MTF)
Latest Updates
Our resurfacing project on Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships has been completed!
Last week, the contractor was able to pave the wearing course (top layer of asphalt), place aggregate (stone) shoulders, and apply pavement markings. The road was re-opened to traffic on Monday, July 1, 2024.
Have questions about the project? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].
WHEN: Wednesday, July 3, 2024
WHERE: Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships
WHY: Shoulder work
BACKGROUND: On Wednesday, July 3, 2024, the Washtenaw County Road Commission (WCRC) will perform shoulder work on Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships.
The road will not be closed to traffic, but delays are likely due to daytime lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The road improvements are expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 07/03/24
WHEN: Monday, July 1, 2024
WHERE: Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships
WHY: Completion of road improvement project
BACKGROUND: On Monday, July 1, 2024, the Washtenaw County Road Commission (WCRC) re-opened Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships.
CONTACT: If you have any questions concerning this project, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654 or [email protected]
ISSUE DATE: 07/01/24
Our resurfacing project on Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships is making great progress.
On June 17, the Washtenaw County Road Commission (WCRC) closed the roadway to begin pulverizing the exiting road surface. Once the existing road surface was crushed and shaped, the contractor was able to place the leveling course (first layer) of asphalt throughout the project limits. Currently, the contractor is working to pave the wearing course (top layer) of asphalt and expects to complete paving within the next few days, permitting weather conditions. Once paving is finished, the next step is placing aggregate (stone) shoulders and pavement markings.
WCRC will send out updates as the project progresses. Have questions about the project? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].
WHEN: Monday, June 17, 2024
WHERE: Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships
WHY: Asphalt resurfacing
BACKGROUND: On Monday, June 17, 2024, the Washtenaw County Road Commission (WCRC) will close Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships to resurface the roadway.
The road improvements are expected to take approximately two weeks. However, all dates are tentative and subject to change due to weather conditions.
Access will be maintained for any residents who work or live within the closure limits.
DETOUR: Click here for the detour map.
CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]
ISSUE DATE: 06/13/24
WHEN: Thursday, May 9, 2024
WHERE: Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships
WHY: Drainage work
BACKGROUND: On Thursday, May 9, 2024, the Washtenaw County Road Commission (WCRC) will begin drainage work on Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships.
The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The road improvements are expected to take approximately six days. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 05/08/24
WHEN: Monday, April 8, 2024
WHERE: Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships
WHY: Forestry work
BACKGROUND: On Monday, April 8, 2024, the Washtenaw County Road Commission (WCRC) will begin forestry work on Dixboro Rd between Plymouth Rd and M-14 in Ann Arbor & Superior Townships.
The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The forestry work is expected to take approximately three days. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 04/04/24
PROJECT: 2024 County-wide Resurfacing Program
WHEN: Thursday, April 4, 2024, at 11 a.m.
WHERE: Online: https://bit.ly/wcrcprojectmeeting
By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754
WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the planned County-wide Resurfacing Program taking place during the 2024 construction season.
During construction, traffic will be maintained under lane restrictions and flagging operations. During specific construction activities, the road may be closed, and a detour will be posted. WCRC estimates it will take approximately two/three weeks, on average, to complete each project, weather pending.
The virtual public meeting will be held via Zoom Thursday, April 4, 2024, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.
Click here to learn more about joining the virtual meeting.
CONTACT: If you have any questions concerning this project, please contact Mike Bernbeck, Project Manager, at (734) 327-6654, or via email at [email protected].
WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].
ISSUE DATE: 03/19/24
The Washtenaw County Road Commission (WCRC) is announcing plans to invest $6.7 million to improve approximately 20 lane miles of pavement throughout Washtenaw County during the 2024 construction season. Cadillac Asphalt was awarded the contract. The projects are funded through the 2021-2024 Four-year County-wide Roads and Non-Motorized Millage, federal funds and Michigan Transportation Funds (MTF).
“Most of these investments are made possible by Washtenaw County residents who travel on these roads every day. As stewards of these precious dollars, WCRC is committed to ensuring these resources are reinvested into communities, in which it came from,” said Mike Bernbeck, WCRC Project Manager.
Construction will begin mid-April and will end during the fall of 2024, weather pending. Listed below are the project locations with a link to their project web page, funding cost and traffic impacts:
Motorists will experience road closures with detours, lane restrictions, and flagging operations. WCRC will maintain access for residents who live or work within the project limits during construction.
WCRC will host a virtual public information meeting regarding the County-wide Resurfacing projects in Spring 2024. WCRC will post project updates online at wcroads.org. Residents can subscribe to road work advisories and project updates here.
For specific questions on this project, contact Mike Bernbeck, Project Manager, (734) 327-6654 or [email protected].
Pictured is a map of our 2024 County-wide Resurfacing Program.