Location of roadwork:
Hogback Rd between M-17 and Clark Rd
Township:
Pittsfield
When is the work being done:
2024
Description of work:
Pulverize & Rehabilitate
Impact on Traffic:
Road Closure with Detour
Funding Source(s):
Four-Year Road and Non-Motorized Path Millage
Latest Updates
Great news the resurfacing project on Hogback Road between M-17 and Clark Rd in Pittsfield Township is nearly complete.
Since the last update, the contractor for the Washtenaw County Road Commission (WCRC) was able to complete the hot mix asphalt resurfacing and placed the aggregate (stone) shoulders and pavement markings. On Saturday, August 10, 2024, WCRC reopened the road. The contractor is working to complete restoration and wrap up a few punch list items.
WCRC will send out updates as the project progresses. Have any questions about the project? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].
WHEN: Saturday, August 10, 2024
WHERE: Hogback Rd between M-17 and Clark Rd in Pittsfield Township
WHY: Completed: road resurfacing
BACKGROUND: On Saturday, August 10,2024, the Washtenaw County Road Commission (WCRC) re-opened Hogback Rd between M-17 and Clark Rd in Pittsfield Township after completing a road resurfacing project.
CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]
ISSUE DATE: 08/11/24
We’re getting ready to pave on our Hogback Rd asphalt resurfacing project taking place between M-17 and Clark Rd in Pittsfield Township!
Since the last update, the contractor for the Washtenaw County Road Commission (WCRC) has completed pulverizing (crushing) the road. While inclement weather has delayed operations for today (August 5th), the contractor plans to pave the leveling course (first layer of asphalt) and the wearing course (top layer of asphalt) later this week. After paving is finished, aggregate (stone) shoulders and permanent pavement markings will be placed.
As a reminder, the road remains closed to all through traffic. WCRC will send out updates as the project progresses. Have any questions about the project? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].
Our resurfacing project on Hogback Rd between M-17 and Clark Rd in Pittsfield Township is progressing well.
On July 25, the Washtenaw County Road Commission (WCRC) closed the road to replace a crossroad culvert. Once the drainage work was completed, the contractor for WCRC began pulverizing (crushing) the existing road surface. This material will be used as supplemental road base for the new asphalt pavement. The contractor expects to begin asphalt paving the week of August 5th, weather permitting.
WCRC will send out updates as the project progresses. Have questions? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].
WHEN: Thursday, July 25, 2024
WHERE: Hogback Rd between M-17 and Clark Rd in Pittsfield Township
WHY: Road resurfacing
BACKGROUND: On Thursday, July 25, 2024, the Washtenaw County Road Commission (WCRC) will close Hogback Rd between M-17 and Clark Rd in Pittsfield Township to begin a road resurfacing project.
The road improvements are expected to take approximately two weeks. However, all dates are tentative and subject to change due to weather conditions.
Access will be maintained for any residents who work or live within the closure limits.
DETOUR: Click here for the detour map.
CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]
ISSUE DATE: 07/21/24
WHEN: Monday, April 15, 2024
WHERE: Hogback Rd between M-17 and Clark Rd in Pittsfield Township
WHY: Drainage work
BACKGROUND: On Monday, April 15, 2024, the Washtenaw County Road Commission (WCRC) will begin drainage work on Hogback Rd between M-17 and Clark Rd in Pittsfield Township.
The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The drainage work is expected to take one week. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 04/11/24
PROJECT: 2024 County-wide Resurfacing Program
WHEN: Thursday, April 4, 2024, at 11 a.m.
WHERE: Online: https://bit.ly/wcrcprojectmeeting
By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754
WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the planned County-wide Resurfacing Program taking place during the 2024 construction season.
During construction, traffic will be maintained under lane restrictions and flagging operations. During specific construction activities, the road may be closed, and a detour will be posted. WCRC estimates it will take approximately two/three weeks, on average, to complete each project, weather pending.
The virtual public meeting will be held via Zoom Thursday, April 4, 2024, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.
Click here to learn more about joining the virtual meeting.
CONTACT: If you have any questions concerning this project, please contact Mike Bernbeck, Project Manager, at (734) 327-6654, or via email at [email protected].
WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].
ISSUE DATE: 03/19/24
The Washtenaw County Road Commission (WCRC) is announcing plans to invest $6.7 million to improve approximately 20 lane miles of pavement throughout Washtenaw County during the 2024 construction season. Cadillac Asphalt was awarded the contract. The projects are funded through the 2021-2024 Four-year County-wide Roads and Non-Motorized Millage, federal funds and Michigan Transportation Funds (MTF).
“Most of these investments are made possible by Washtenaw County residents who travel on these roads every day. As stewards of these precious dollars, WCRC is committed to ensuring these resources are reinvested into communities, in which it came from,” said Mike Bernbeck, WCRC Project Manager.
Construction will begin mid-April and will end during the fall of 2024, weather pending. Listed below are the project locations with a link to their project web page, funding cost and traffic impacts:
Motorists will experience road closures with detours, lane restrictions, and flagging operations. WCRC will maintain access for residents who live or work within the project limits during construction.
WCRC will host a virtual public information meeting regarding the County-wide Resurfacing projects in Spring 2024. WCRC will post project updates online at wcroads.org. Residents can subscribe to road work advisories and project updates here.
For specific questions on this project, contact Mike Bernbeck, Project Manager, (734) 327-6654 or [email protected].