WCRC staff produced the 2024 Saline Township Local Road Funding Packet which includes information about the Local Road Matching Program, road funding, asset management and road treatments. Below is a summary of the roads, bridges and culverts located in Saline Township.
Primary Roads
- 12.21 miles of paved primary roads
- 11.65 miles unpaved primary roads
- 1 bridges (more than 20’ span)
- 9 culverts, greater than 5’ in diameter
Local Roads
- 1.97 miles of local paved roads
- 27.96 miles of local unpaved roads
- 3 bridges (more than 20’ span)
- 10 culverts on local collector roads, greater than 5’ in diameter
WCRC has also provided a link to the township website, see button below.
Latest Updates
WHEN: Monday February 12, 2024
WHERE: Mohart Rd between Hack Rd and Arkona Rd in Saline Township
WHY: Completion of culvert replacement
BACKGROUND: On Monday February 12, 2024, the Washtenaw County Road Commission (WCRC) re-opened Mohart Rd between Hack Rd and Arkona Rd in Saline Township.
CONTACT: If you have any questions concerning this project, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696 or [email protected]
ISSUE DATE: 02/12/24
WHEN: Monday, February 12, 2024
WHERE: Mohart Rd between Hack Rd and Arkona Rd in Saline Township
WHY: Culvert replacement
BACKGROUND: On Monday, February 12, 2024, the Washtenaw County Road Commission (WCRC) closed Mohart Rd between Hack Rd and Arkona Rd in Saline Township to replace a crossroad culvert.
The roadwork is expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Ken Harris Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 02/12/24