Location of roadwork:
State Rd between US 12 (Michigan Ave) and Old State Rd
Township:
Pittsfield
When is the work being done:
2026
Description of work:
Mill & Resurfacing, Widening
Impact on Traffic:
Road Closure with Detour
Funding Source(s):
Federal, Four-Year Road and Non-Motorized Path Millage
Latest Updates
The contractor working on behalf of the Washtenaw County Road Commission (WCRC) has completed several items of work on State Rd between Michigan Ave (US-12) and Old State Rd in Pittsfield Township. This includes the installation of new crossroad culverts, construction of new concrete curbs, and installation of the aggregate base.
The next step in the work includes asphalt paving of the newly widened section north of Campus Parkway. Once that has been completed, the contractor will shift to milling (grinding off top layer) and asphalt resurfacing of the existing pavement. This will include paving final asphalt layer (i.e., top course) to the widened section, ensuring a smooth and durable finish for the entire roadway.
Throughout the closure, access to local businesses remains open. WCRC reminds motorists to be extra cautious; please proceed slowly through the construction area and remain attentive to both construction personnel and fellow drivers to promote everyone’s safety.
The WCRC will continue to send updates as the project progresses.
If you have questions, please contact Felix Weber, Project Manager, at (734) 327-6689 or email [email protected].


Pictured above is new curb on State Rd at Campus Parkway in Pittsfield Township.
On June 8, the Washtenaw County Road Commission (WCRC) closed State Rd between Michigan Ave (US-12) and Old State Rd in Pittsfield Township. During the week of June 8th, the contractor working on behalf of the WCRC completed removing the existing shoulder material, carried out excavation and grading along the widened section, and initiated the culvert replacement just south of Old State Rd.
Looking ahead:
- Completion of the culvert and grading work
- Installation of the aggregate base
- Installation of the concrete curb and gutter
Throughout the closure, access to local businesses remains open. WCRC would like to remind motorists to be extra cautious; please proceed slowly through the construction area and remain attentive to both construction personnel and fellow drivers to ensure everyone’s safety. WCRC will continue to send updates as the project progresses.
If you have questions, please contact Felix Weber, Project Manager, at (734) 327-6689 or email [email protected].

Pictured above is pavement removal on State Rd between Michigan Ave (US-12) and Old State Rd in Pittsfield Township.

Pictured above is placement of new culverts on State Rd between Michigan Ave (US-12) and Old State Rd in Pittsfield Township.
WHEN: Monday, June 8, 2026
WHERE: State Rd between US-12 (Michigan Ave) and Old State Rd in Pittsfield Township
WHY: Milling, resurfacing, and road widening
BACKGROUND: On Monday, June 8, 2026, the Washtenaw County Road Commission (WCRC) will close State Rd between US-12 (Michigan Ave) and Old State Rd in Pittsfield Township for a milling and resurfacing project with road widening.
The work is expected to take approximately nine weeks to complete. However, all dates are tentative and subject to change due to weather conditions.
The road will be closed to all through traffic. Businesses within the road closure will have access.
DETOUR: Detour map
CONTACT: If you any questions concerning this work, please contact Felix Weber, Project Manager, at (734) 327-6689 or email [email protected]
ISSUE DATE: 06/01/2026
WHEN: Monday, March 9, 2026
WHERE: State Rd between Michigan Ave and Old State Rd in Pittsfield Township
WHY: Forestry work
BACKGROUND: On Monday, March 9, 2026, the Washtenaw County Road Commission (WCRC) will be performing forestry work on State Rd between Michigan Ave and Old State Rd in Pittsfield Township.
The road will not be closed to traffic, but delays are likely due to intermittent lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The forestry work is expected to take approximately two days to complete. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Jared Powers, Assistant Superintendent of Maintenance, (734) 327-6650, or via email at [email protected]
ISSUE DATE: 03/05/26
WHEN: Friday, February 14, 2025, at 11 a.m.
WHERE: Online: https://bit.ly/wcrcprojectmeeting
By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754
WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the planned County-wide Resurfacing Program taking place during the 2025 construction season.
During construction, traffic will be maintained under lane restrictions and flagging operations. During specific construction activities, the road may be closed, and a detour will be posted. WCRC estimates it will take approximately two/three weeks, on average, to complete each project, weather pending.
The virtual public meeting will be held via Zoom Friday, February 14, 2025, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.
Click here to learn more about joining the virtual meeting.
CONTACT: If you have any questions concerning these project, please contact Felix Weber-Bailey, Project Manager, (734) 327-6654, email [email protected], Kevin Dubnicki, Project Manager, (734) 327 -6693, email [email protected] and Ken Harris, Superintendent, (734) 327-6696, email [email protected]
WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].
ISSUE DATE: 02/04/25
The Washtenaw County Road Commission (WCRC) is excited to announce a $9.4 million investments in improving approximately 37 miles of paved and unpaved roads across Washtenaw County during the 2025 construction season. These important projects are made possible through a combination of funding sources, including the 2025-2028 Four-Year County-Wide Roads and Non-motorized Millage, Federal Funds, Township partnerships, and Michigan Transportation Funds (MTF).
“This year’s resurfacing program is just one of the ways WCRC is committed to protecting the county’s transportation infrastructure,” said Brent Schlack, P.E., Director of Engineering and County Highway Engineer. “The successful completion of these critical projects requires a blend of resources and collaboration.”
Construction is slated to begin in mid-April and will continue through the fall of 2025, weather permitting. As part of this program, WCRC will also undertake necessary forestry work to maintain the safety and integrity of the roadways.
For a list of the specific projects, funding details, and anticipated traffic impacts, please refer to the links provided below for each project location.
Motorists will experience road closures with detours, daytime road closures, lane restrictions, and flagging operations. WCRC will maintain access for residents who live or work within the project limits during construction.
WCRC will host a virtual public information meeting regarding the County-wide Resurfacing projects on February 14, 2025. WCRC will post project updates online at wcroads.org. Residents can subscribe to road work advisories and project updates here.
For specific questions on these projects, contact Felix Weber-Bailey, Project Manager, (734) 327-6654, email [email protected], Kevin Dubnicki, Project Manager, (734) 327 -6693, email [email protected] and Ken Harris, Superintendent, (734) 327-6696, email [email protected].
Pictured is a map of our 2025 County-wide Resurfacing Program.