Location of roadwork:
Scio Church Rd between Sylvan Township Line and Fletcher Rd
Township:
Lima
When is the work being done:
2025
Description of work:
Seal Coat
Impact on Traffic:
Lane Restrictions and Flagging Operation
Funding Source(s):
Four-Year Road and Non-Motorized Path Millage
Latest Updates
The Washtenaw County Road Commission (WCRC) will invest approximately $ 2.2 million to seal coat around 49 lane miles of pavement across the county during the 2025 construction season. This work is funded by the current Four-Year Countywide Roads and Non-Motorized Millage and the Michigan Transportation Fund (MTF).
Seal coating protects roads from wear and tear caused by traffic, sun exposure, and Michigan’s freeze-thaw cycles. It is applied to roads in good or fair condition to extend their lifespan and delay costly repairs. “Seal coating is more than a surface treatment—it’s an investment that extends the life of our roads and reduces long-term costs,” said Ken Harris, WCRC Superintendent of Maintenance.
What Is Seal Coating?
Seal coating includes two steps:
- Chip seal: A thin layer of liquid asphalt is applied, followed by small stones pressed into place.
- Fog seal: A second layer of asphalt is sprayed over the chip-sealed surface to lock in the stones. Final pavement markings are added once the fog seal has been cured.
What to Expect:
Work begins in May 2025 (weather permitting). Roads remain open during the process, but drivers must follow the posted 35 mph advisory speed to avoid damage from loose stones and uncured asphalt. Fog seal takes a few hours to cure—do not drive on freshly sealed roads until reopened. WCRC crews will be on site with flaggers, pilot vehicles, and signage to guide traffic safely. Please see below for the list of project locations, traffic impacts, and the tentative schedule.
Have questions about the program, contact Ken Harris, Superintendent of Maintenance, at (734) 327-6696, or via email at [email protected].

WHEN: Wednesday, May 14, 2025
WHERE: Scio Church Rd between M-52 and Township Line in Sylvan Township
WHY: Chipseal
BACKGROUND: On Wednesday, May 14, 2025, the Washtenaw County Road Commission (WCRC) will have lane restrictions on Scio Church Rd between M-52 and the Township Line in Sylvan Township for chipseal.
The road will not be closed to traffic, but delays are likely due to intermittent lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.
The chipseal is expected to take approximately one day to complete. However, all dates are tentative and subject to change due to weather conditions.
CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]
ISSUE DATE: 05/08/25