Whitmore Lake Rd

Location of roadwork:
Whitmore Lake Rd between M-14 Ramps and Stein Rd

Township:
Ann Arbor

When is the work being done:
2025

Description of work:
Mill & Resurfacing

Impact on Traffic:
Flagging

Funding Source(s):
Federal

Latest Updates

November 17, 2025 County-wide Road Resurfacing-Survey

Thank you for subscribing to receive email updates about the Washtenaw County Road Commissions County-wide Road Resurfacing projects.

We are always seeking ways to improve our communications and we need your feedback. Please complete this short survey and let us know how we did communicating about road resurfacing projects. Click here for the survey.

Thank you again for subscribing and continue to follow our updates!

If you would like to subscribe to receive other road updates from us, for example, road closure alerts, click here to update your email preferences.

September 26, 2025 Project Update #1: Whitmore Lake Rd Resurfacing (Ann Arbor Twp)

On September 20, 2025, Cadillac Asphalt, the contractor working on behalf of the Washtenaw County Road Commission (WCRC), replaced the gravel shoulders along Whitmore Lake Rd between M-14 Ramps and Stein Rd in Ann Arbor Township.  

Moving forward: The contractor will be adjusting monument boxes within the roadway surface. Looking ahead, final paint markings will be installed to complete the project.   

WCRC will continue to send updates as the project progresses. If you have questions, contact Kevin Dubnicki, Project Manager – Design & Construction, (734) 327-6693, or via email at [email protected].     

Picture above are the newly placed gravel shoulders on Whitmore Lake Rd between M-14 Ramps and Stein Rd Ann Arbor Township. 

September 18, 2025 Revised Intermittent Lane Closures: Whitmore Lake Rd (Ann Arbor Twp)

WHEN: Monday, September 8, 2025

WHERE: Whitmore Lake Rd between M-14 Ramps and Stein Rd in Ann Arbor Township

WHY: Milling and resurfacing

BACKGROUND: On Monday, September 8, 2025, WCRC started performing milling and resurfacing work on Whitmore Lake Rd between M-14 Ramps and Stein Rd in Ann Arbor Township.

The road will not be closed to traffic, but delays are likely due to intermittent lane closures and lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The road improvements have been extended and are expected to take approximately four weeks to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Kevin Dubnicki via email [email protected] or phone (734) 327-6693

ISSUE DATE: 09/18/2025

September 4, 2025 Revised Intermittent Lane Closures and Restrictions: Whitmore Lake Rd (Ann Arbor Township)

WHEN: Monday, September 8, 2025

WHERE: Whitmore Lake Rd between M-14 Ramps and Stein Rd in Ann Arbor Township

WHY: Milling and resurfacing

BACKGROUND: On Monday, September 8, 2025, WCRC will be performing milling and resurfacing work on Whitmore Lake Rd between M-14 Ramps and Stein Rd in Ann Arbor Township.

The road will not be closed to traffic, but delays are likely due to intermittent lane closures and lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The road improvements are expected to take approximately one week to complete. However, all dates are tentative and subject to change due to weather conditions.

 CONTACT: If you have any questions concerning this work, please contact Kevin Dubnicki via email [email protected] or phone (734) 327-6693

ISSUE DATE: 09/04/2025

August 25, 2025 Intermittent Lane Closures & Restrictions: Whitmore Lake Rd (Ann Arbor Twp)

WHEN: Tuesday, September 2, 2025

 WHERE: Whitmore Lake Rd between M-14 Ramps and Stein Rd in Ann Arbor Township

 WHY: Milling and resurfacing

 BACKGROUND: On Tuesday, September 2, 2025, WCRC will be performing milling and resurfacing work on Whitmore Lake Rd between M-14 Ramps and Stein Rd in Ann Arbor Township.

The road will not be closed to traffic, but delays are likely due to intermittent lane closures and lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The road improvements are expected to take approximately two weeks to complete. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Kevin Dubnicki via email [email protected] or phone (734) 327-6693

ISSUE DATE: 08/25/2025

February 4, 2025 Virtual Public Meeting: 2025 Resurfacing Program (County-wide)

WHEN: Friday, February 14, 2025, at 11 a.m.

WHERE: Online: https://bit.ly/wcrcprojectmeeting

By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754

WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the planned County-wide Resurfacing Program taking place during the 2025 construction season.

During construction, traffic will be maintained under lane restrictions and flagging operations. During specific construction activities, the road may be closed, and a detour will be posted. WCRC estimates it will take approximately two/three weeks, on average, to complete each project, weather pending.

The virtual public meeting will be held via Zoom Friday, February 14, 2025, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.

Click here to learn more about joining the virtual meeting.

CONTACT: If you have any questions concerning these project, please contact Felix Weber-Bailey, Project Manager, (734) 327-6654, email [email protected], Kevin Dubnicki, Project Manager, (734) 327 -6693, email [email protected] and Ken Harris, Superintendent, (734) 327-6696, email [email protected]

WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].

ISSUE DATE: 02/04/25

February 4, 2025 Project Announcement: 2025 Resurfacing Program (County-wide)

The Washtenaw County Road Commission (WCRC) is excited to announce a $9.4 million investments in improving approximately 37 miles of paved and unpaved roads across Washtenaw County during the 2025 construction season. These important projects are made possible through a combination of funding sources, including the 2025-2028 Four-Year County-Wide Roads and Non-motorized Millage, Federal Funds, Township partnerships, and Michigan Transportation Funds (MTF). 

 “This year’s resurfacing program is just one of the ways WCRC is committed to protecting the county’s transportation infrastructure,” said Brent Schlack, P.E., Director of Engineering and County Highway Engineer. “The successful completion of these critical projects requires a blend of resources and collaboration.” 

 Construction is slated to begin in mid-April and will continue through the fall of 2025, weather permitting. As part of this program, WCRC will also undertake necessary forestry work to maintain the safety and integrity of the roadways. 

 For a list of the specific projects, funding details, and anticipated traffic impacts, please refer to the links provided below for each project location. 

Motorists will experience road closures with detours, daytime road closures, lane restrictions, and flagging operations. WCRC will maintain access for residents who live or work within the project limits during construction. 

WCRC will host a virtual public information meeting regarding the County-wide Resurfacing projects on February 14, 2025. WCRC will post project updates online at wcroads.org. Residents can subscribe to road work advisories and project updates here.

For specific questions on these projects, contact Felix Weber-Bailey, Project Manager, (734) 327-6654, email [email protected], Kevin Dubnicki, Project Manager, (734) 327 -6693, email [email protected] and Ken Harris, Superintendent, (734) 327-6696, email [email protected] 

Pictured is a map of our 2025 County-wide Resurfacing Program.

Contact information:
Kevin Dubnicki
    • (734) 327-6693
Receive Updates on the Project
Subscribe to Project Updates
Washtenaw County Road Commission
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.