Zeeb Road

Location of roadwork:
Between Pleasant Lake Road and Ellsworth Road

Township:
Lodi

When is the work being done:
Tree removal: March 2021; Road construction: June - late-Summer 2021

Description of work:
Road Reconstruction

Impact on Traffic:
Stage 1: Intersection of Pleasant Lake Rd/Zeeb Rd will be closed; Stage 2: Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd will be closed

Funding Source(s):
Four-Year Road and Non-Motorized Path Millage, Michigan Transportation Fund (MTF)

Latest Updates

September 10, 2021 Road Reopened: Zeeb Rd (Lodi Twp)

WHEN: Effective Friday, September 10, 2021

WHERE: Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd in Lodi Township

BACKGROUND: On Friday, September 10, 2021, at approximately 1 p.m. the Washtenaw County Road Commission reopened Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd in Lodi Township after reconstructing and paving the road.

CONTACT: If you have any questions concerning this project, please contact James Hui, project manager, (734) 327-6660, huij@wcroads.org.

ISSUE DATE: 09/10/21

photo of the paved road

Pictured above is the newly paved section of Zeeb Rd.

August 31, 2021 Zeeb Rd: Getting Closer!

We continue to make great progress at the Zeeb Rd Paving Project in Lodi Township.

Our contractor finished paving the road last week. Up next on the agenda will be paving the driveway approaches. Once the driveway approaches are completed they just have a few minor checklist items to complete before we can reopen the road. We are in the home stretch!

Please note that the road remains closed to through-traffic while we work to complete this project. We will send out an advisory when the road is reopened to traffic.

If you have any questions concerning this work, please contact James Hui, project manager, (734) 327-6660, or via email at huij@wcroads.org.

photo of paving crew

Pictured above is the paving crew working on Zeeb Rd last week.

August 17, 2021 Zeeb Rd: Rain Delay

Progress was delayed last week at the Zeeb Rd Paving Project in Lodi Township due to the storms we received throughout the county.

Our contractor was able to pave the first layer on the southbound lane between Pleasant Lake Rd and Rosemary Ct before the weather postponed our plans. We are now working to pave the first layer of the northbound lane today. Our contractors are also working to finish grading the road between Rosemary Ct and Ellsworth Rd to prepare for paving.

If you have any questions concerning this work, please contact James Hui, project manager, (734) 327-6660, or via email at huij@wcroads.org.

pictured is first layer of asphalt

Pictured above is the first layer of asphalt on the southern portion of the Zeeb Rd Paving Project.

July 28, 2021 Road Reopened: Pleasant Lake Rd (Lodi Twp)

WHEN: Effective Wednesday, July 28, 2021

WHERE: Intersection of Pleasant Lake Rd and Zeeb Rd in Lodi Township

WHY: Completion of intersection widening and flashing beacon installation

BACKGROUND: On Wednesday, July 28, 2021, the Washtenaw County Road Commission reopened the intersection of Pleasant Lake Rd and Zeeb Rd in Lodi Township after widening the intersection and installing a flashing beacon.

Please note, that Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd will remain closed for a paving project.

The No Through Truck restriction that was temporarily lifted for Parker Rd between Scio Church Rd and Pleasant Lake Rd AND Scio Church Rd between Parker Rd and Wagner Rd in Freedom, Lodi and Scio Townships will be reinstated.

CONTACT: If you have any questions, please contact James Hui, project manager (734) 327-6660, or via email at huij@wcroads.org.

ISSUE DATE: 07/28/21

July 20, 2021 Pleasant Lake Rd and Zeeb Rd: Pave the Way

We continue to make great progress at the intersection of Pleasant Lake Rd and Zeeb Rd in Lodi Township, especially given this week’s much more promising weather forecast.

Our contractors paved the first layer of asphalt yesterday. They will also be paving the final layer of asphalt today, weather pending. The intersection will remain closed after paving is completed while they continue restoration and traffic signal work.

If you have any questions concerning this work, please contact James Hui, project manager, (734) 327-6660, or via email at huij@wcroads.org.

photo of base course paving

Our contractor worked on paving the base course of the intersection of Pleasant Lake Rd and Zeeb Rd earlier this week (pictured above).

July 7, 2021 Pleasant Lake Rd and Zeeb Rd: Rain, Rain, Go Away

Despite the recent rainy weather conditions, we are still making progress at the intersection of Pleasant Lake Rd and Zeeb Rd in Lodi Township. Our contractors have removed all the existing asphalt and they have also installed the new storm sewer pipe and structures. They are also working on grading the road base.

Once this earthwork is complete and the stone base has been placed, we will start to pour the concrete curb.

If you have any questions concerning this work, please contact James Hui, project manager, (734) 327-6660, or via email at huij@wcroads.org.

photo of road grading on Pleasant Lake Rd in Lodi Township

We are preparing the road base on Pleasant Lake Rd and Zeeb Rd.

June 21, 2021 Pleasant Lake Rd and Zeeb Rd: Intersection Closed!

The intersection of Pleasant Lake Rd and Zeeb Rd in Lodi Township is officially closed to traffic and a detour has been posted. We will be widening the intersection and installing a flashing beacon.

The work is expected to be completed by the end of July. However, all dates are tentative and subject to change due to weather conditions.

The reconstruction and paving of Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd will take place after the intersection project.

If you have any questions concerning this work, please contact James Hui, project manager, (734) 327-6660, or via email at huij@wcroads.org.

photo of road closure barricades

Pictured above are the barricades placed for the intersection closure of Pleasant Lake Rd and Zeeb Rd.

June 17, 2021 Intersection Closure: Pleasant Lake Rd and Zeeb Rd (Lodi Twp)

WHEN: Starting Monday, June 21, 2021

WHERE: Intersection of Pleasant Lake Rd and Zeeb Rd in Lodi Township

WHY: Intersection widening and flashing beacon installation

BACKGROUND: On Monday, June 21, 2021, the Washtenaw County Road Commission will close the intersection of Pleasant Lake Rd and Zeeb Rd in Lodi Township to widen the intersection and install a flashing beacon.

The intersection will be closed to all traffic during construction.

The work is expected to be completed by the end of July. However, all dates are tentative and subject to change due to weather conditions.

The reconstruction and paving of Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd will take place after the intersection project.

DETOUR: Click here for the detour map

CONTACT: If you have any questions concerning this project, please contact James Hui, project manager, (734) 327-6660, huij@wcroads.org.

ISSUE DATE: 06/17/21

June 15, 2021 Zeeb Rd: Intersection Coming Soon!

Stage 1 of the Zeeb Rd Paving Project in Lodi Township is scheduled to begin early next week. During this stage, we will be widening the intersection of Pleasant Lake Rd and Zeeb Rd and installing a flashing beacon (“blinker” signal).

The intersection will be closed to traffic during construction and a detour will be posted. The intersection is expected to be closed for 4-6 weeks. Once the intersection work is completed, we will shift our focus to Stage 2, reconstructing and paving Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd.

If you have any questions concerning this work, please contact James Hui, project manager, (734) 327-6660, or via email at huij@wcroads.org.

March 23, 2021 Lane Restrictions- Zeeb Rd and Pleasant Lake Rd (Lodi Twp)

WHEN: Starting Wednesday, March 24, 2021

WHERE: Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd AND the intersection of Zeeb Rd and Pleasant Lake Rd in Lodi Township

WHY: Tree removal

BACKGROUND: On Wednesday, March 24, 2021, a contractor for the Washtenaw County Road Commission (WCRC) will begin to remove selected trees along Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd AND at the intersection of Zeeb Rd and Pleasant Lake Rd in Lodi Township

Zeeb Rd will be open to local traffic only. The westbound lane of Pleasant Lake Rd will be temporarily closed at the intersection. WCRC encourages other motorists and emergency services to use an alternate route if possible.

This work is expected to take approximately 4 days. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact James Hui, project manager, (734) 327-6660, or via email at huij@wcroads.org.

ISSUE DATE: 03/23/21

February 12, 2021 Virtual Public Meeting Notice- Zeeb Rd Phase 2

WHAT: Zeeb Rd Paving Project (Phase 2)

WHEN: Tuesday, March 2, 2021, 11 a.m.

WHERE: Online: https://bit.ly/wcrcprojectmeeting

By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754

WHY: The Washtenaw County Road Commission will hold a virtual project information meeting regarding the Zeeb Rd Phase 2 Paving Project planned this summer in Lodi Township.

As a part of this project, Zeeb Rd between Pleasant Lake Rd and Ellsworth Rd will be reconstructed and paved. During construction, the road will be closed to through traffic. WCRC hopes to begin road work in May and reopen Zeeb Road in late-summer 2021.

The virtual public meeting will be held via Zoom on Tuesday, March 2, 2021, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to wcroads.org after the meeting ends.

Click here to learn more about joining the virtual meeting.

CONTACT: If you have any questions concerning this project, please contact James Hui, project manager, (734) 327-6660, huij@wcroads.org.

WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Emily Kizer, communications manager, by phone (734) 327-6646 or by email kizere@wcroads.org.

ISSUE DATE: 02/12/2021

February 3, 2021 Project Announcement: Zeeb Rd Phase 2 (Lodi Twp)

The Washtenaw County Road Commission (WCRC) is pleased to announce it will be reconstructing Zeeb Road between Pleasant Lake Road and Ellsworth Road in Lodi Township during the 2021 Construction Season. When completed, this one-mile segment of county primary road will be paved.

Why this road or intersection?

In 2019, WCRC completed the Zeeb Road (Phase 1) Reconstruction between Ellsworth Road and Waters Road. After acquiring additional funding, thanks in part to Roads and Non-Motorized Millage renewed by voters in 2020, WCRC will complete Phase 2 this year, providing a paved connection to Pleasant Lake Road.

When will this project be completed?

WCRC hopes to begin Phase 2 road work in May. Road design is underway and permit applications are being prepared. Discussions with adjacent property owners will commence shortly. Some trees near the roadway need to be removed to accommodate proper drainage and modern road design. Considering environmental restrictions, these trees will be felled before March 31, 2021.

During construction Zeeb Road between Pleasant Lake Road and Ellsworth Road will be closed to through traffic and a detour will be posted. The contractor will maintain access within the closure only for residents and property owners who live or own property within the project limits. WCRC hopes to reopen Zeeb Road in late-summer 2021.

How can I get more information?

WCRC will hold a virtual public information meeting on Tuesday, March 2, 2021, from 11 a.m. – 12:30 p.m. via Zoom. In addition, click here to visit WCRC’s Zeeb Road project page to subscribe to project update emails.

For specific questions on this project, contact James Hui, project manager, huij@wcroads.org or (734) 327-6660.

Contact information:
James Hui
    • (734) 327-6660
Receive Updates on the Project