was successfully added to your cart.

Textile Road Paving

Location of roadwork:
State Road to Michigan Avenue

Township:
Pittsfield

When is the work being done:
Construction will take place June 18 through Summer 2019

Description of work:
Non-Motorized Path Construction, Paving, Road Reconstruction

Impact on Traffic:
Full closure to through-traffic between Hines Drive and Michigan Avenue

Funding Source(s):
Federal, Four-Year Road and Non-Motorized Path Millage, Michigan Transportation Fund (MTF), Township

Latest Updates

November 16, 2018 Winter Maintenance on Textile Road

The snow has certainly started earlier than we would have liked this fall. Since we were not able to complete all of the Textile Road paving project this year, here’s our plan for winter maintenance:

  • For the next couple of weeks, the responsibility for winter maintenance for Textile Road from State Road to Michigan Avenue (US-12) falls on our contractor, Hoffman Brothers.
  • Once Hoffman Brothers has finished a few items, responsibility of winter maintenance for the completed segments of Textile Road from State Road to Campbell Road; and Textile Road from Platt Road to Michigan Avenue (US-12) will revert back to the Washtenaw County Road Commission’s responsibility.
  • Winter maintenance for the segment of Textile Road from Campbell Road to Platt Road will remain the responsibility of Hoffman Brothers throughout the entire winter season. This segment will be closed to through-traffic all winter.

We know this is an unusual situation and appreciate your patience. If you have any problems with the level of service this winter, please contact Mark McCulloch, project manager, (734) 327-6679 or mccullochm@wcroads.org.

October 30, 2018 Road Closure: Textile Road

WHEN: Wednesday, October 31, 2018

WHERE: Textile Road between State Road and Hines Drive/Interfirst Drive in Pittsfield Township

WHY: Paving

BACKGROUND: On Wednesday, October 31, 2018, the Washtenaw County Road Commission (WCRC) will close Textile Road between State Road and Hines Drive/Interfirst Drive in Pittsfield Township to ALL traffic to pave this section of road.

Local traffic to the businesses on Hines Drive and Interfirst Drive must use State Road entrances during this closure.

WCRC expects to have Textile Road reopened to local traffic in the evening of Wednesday, October 31, however the road will remain closed to through traffic. All dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Mark McCulloch, senior project manager, (734) 327-6679, or via email at mccullochm@wcroads.org

For more information about the Textile Road reconstruction project, visit: wcroads.org/wcrc-project/textile-road-3/

ISSUE DATE: 10/30/18

October 25, 2018 Work Will Carry Over

Unfortunately, the labor stoppage from earlier this Fall has impacted the timeline for the Textile Road reconstruction project and we will not be able to get all the planned work done before Winter. We are working with our contractors to complete as much work as possible before inclement weather stops progress. The goal is to finish Textile Road between State Road and Campbell Road as well as Platt Road to Michigan Avenue this year. The remaining portion between Campbell Road and Platt Road will be worked on in 2019, along with the Textile-Platt Greenway.

In the meantime, our contractors have been able to make some significant progress over the past month. This week, crews were able to complete much of the curb installation along Textile Road from Marton Drive to Campbell Road. Check out the drone photo below to see the progress.

As we get closer to Winter, we will provide additional progress updates. If you have questions, please contact Mark McCulloch, project manager, (734)327-6679 or mccullochm@wcroads.org.

Drone View of Textile Road Heading East

September 27, 2018 Work Resumes on Textile Road

The labor dispute that has halted work on Textile Road for the past three weeks has come to a temporary resolution. Construction work on Textile Road between Hines Drive and Michigan Ave (US-12) will begin tomorrow. We are unsure at this time what this delay will mean for the project’s completion date.

To read more about the dispute, visit: mlive.com/news/labor_dispute

Thank you for your patience during this unusual time. If you have questions, please contact Mark McCulloch, project manager, (734)327-6679 or mccullochm@wcroads.org.

September 4, 2018 Work Stoppage Impacts Textile Road Project

As of 7 a.m. this morning, many projects on county roads in Washtenaw County, including most of the work on Textile Road in Pittsfield Township, are on hold due to a labor dispute between the Michigan Infrastructure Transportation Association (MITA) and the Operating Engineer’s Local 324. The Washtenaw County Road Commission (WCRC) is not a party to these negotiations.

This work stoppage halts all paving, and some earthwork and underground work done by contractors on county roads. Some bridge work may also be impacted, depending on the contractor.

The railroad work on Textile Road west of Marton Road will continue as planned.

Please contact Mark McCulloch, project manager, if you have any questions – mccullochm@wcroads.org or (734) 327-6679.

Click read the work stoppage press release issued by WCRC.

September 4, 2018 Railroad Closure

As of this morning, the railroad crossing on Textile Road west of Marton Road is closed to all traffic. The railroad contractor is rebuilding the approaches to the tracks in preparation for the grand opening of Textile Road later this year. If you live or work on Textile Road, you will still be able to access your home or workplace, but you may need to use State Road, Marton Road, or anther side road since no traffic will be able to traverse the railroad tracks through Saturday, September 8 (weather permitting).

As always, please contact Mark McCulloch, project manager if you have any questions – mccullochm@wcroads.org or (734) 327-6679.

August 28, 2018 Road Closure to Local Traffic

We will be temporarily closing Textile Road to all traffic from approximately 500 feet east of Marton Road to Campbell Road while our contractor works on shaping the roadway. If you live or work on Textile Road, you will still be able to access your home or workplace but you will need to use side roads since no traffic will be able to traverse this section of road.

We expect this restriction to be in place for 2 – 3 weeks, depending on the weather.

Thanks for your patience!

As always, please contact Mark McCulloch, project manager if you have any questions – mccullochm@wcroads.org or (734) 327-6679.

August 14, 2018 Road Opening: Textile Road and Platt Road Intersection

WHEN: Effective August 14, 2018

WHERE: Intersection of Platt Road and Textile Road in Pittsfield Township

WHY: Completion of Intersection reconstruction project

BACKGROUND: On Tuesday, August 14, 2018, the Washtenaw County Road Commission (WCRC) re-opened the intersection of Platt Road and Textile Road in Pittsfield Township.

CONTACT: If you have any questions concerning this project, please contact Matt MacDonell, Director of Engineering, (734) 327-6688 or macdonellm@wcroads.org

For more information about WCRC road closures and re-openings visit wcroads.org/news/media-advisories.

ISSUE DATE: 08/14/18

August 10, 2018 Road Closure: Intersection of Marton Road and Textile Road (Pittsfield Twp)

WHEN: Starting Monday, August 13, 2018

WHERE: Intersection of Marton Road and Textile Road in Pittsfield Township

WHY: Intersection reconstruction

BACKGROUND: On Monday, August 13, 2018, the Washtenaw County Road Commission (WCRC) and its contractor will temporarily close the intersection of Marton Road and Textile Road in Pittsfield Township to all traffic. Visitors will be unable to access Marsh View Meadows park during this closure.

This work is within the already closed section of Textile Road and is part of the reconstruction project that began this spring.

If you live or work within this area, you will still be able to access your home or workplace but will need to use side roads since no traffic can traverse the closed intersection.

The intersection work is expected to take approximately 2 days. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Matt MacDonell, Director of Engineering, (734) 327-6688, or via email at macdonellm@wcroads.org

For more information about WCRC road closures visit wcroads.org/news/media-advisories.

ISSUE DATE: 08/10/18

July 26, 2018 Drainage Work at Pittsfield Drain #5

This morning our contractor will begin work at Pittsfield Drain #5 that runs underneath Textile Road between Marton Road and Campbell Road.

We will be temporarily closing Textile Road to local traffic between Marton Road and Campbell Road while we work. If you live or work within this area, you will still be able to access or your home or workplace but you will need to use side roads since no traffic can traverse the closure. We expect this work to be completed by the end of the day today.

Thanks for your patience!

As always, please contact Mark McCulloch, project manager if you have any questions – mccullochm@wcroads.org or (734) 327-6679.

July 3, 2018 Road Closure: Textile Road and Platt Road Intersection (Pittsfield Twp)

WHEN: Starting Wednesday, July 11

WHERE: Intersection of Platt Road and Textile Road in Pittsfield Township

WHY: Intersection reconstruction

BACKGROUND: On Wednesday, July 11, 2018, the Washtenaw County Road Commission (WCRC) and its contractor will close the intersection of Platt Road and Textile Road in Pittsfield Township to reconstruct the intersection. This work is a part of the reconstruction of Textile Road that is currently underway.

The intersection will be closed to all through traffic and a detour will be posted.

The intersection is expected to be reopened by Wednesday, August 8, 2018. However, please be advised that all dates are tentative and subject to change due to weather conditions.

CONTACT: Questions concerning the project should be directed to:

For more information about WCRC road closures visit wcroads.org/news/media-advisories.

ISSUE DATE: 07/03/18

June 27, 2018 Textile Road Local Traffic Update

Good news! We made the necessary repair between Hines Drive and the Ann Arbor Railroad earlier this afternoon. That section of Textile Road is back open to local traffic (those who live or work within the construction zone). Textile Road from Hines Drive to Michigan Avenue remains closed to all through-traffic.

During the next couple of weeks, as we progress down the road with the storm sewer, we will have more temporary local traffic closures like this one. We will send an email update ahead of these closures whenever possible.

Tomorrow, June 28, 2018, is the next local traffic closure. We will be temporarily closing Textile Road to local traffic between Marton Road and Campbell Road while we work. If you live or work within this area, you will still be able to access or your home or workplace but you will need to use side roads since no traffic can traverse the closure.

Thanks for your patience!

As always, please contact Mark McCulloch, project manager if you have any questions – mccullochm@wcroads.org or (734) 327-6679.

June 26, 2018 Textile Road – Temporary closure to all traffic

We’re one week into our full closure of Textile Road and the project is progressing pretty well, utilities are working on relocating their facilities and our road contractor is working on the storm sewer.

Unfortunately, we have run into an unexpected drainage issue between Hines Drive and the Ann Arbor Railroad that we need to fix. This means that Textile Road will be closed to all traffic, including local traffic, tomorrow, Wednesday, June 27, between Hines Drive and the Ann Arbor Railroad. If you live or work between Hines Drive and the railroad crossing, you will still be able to access or your home or workplace but you will need to use side roads since no traffic can traverse this closure.

We hope to fix this issue sometime tomorrow and reopen this section to local traffic only, as long as the weather cooperates. If it rains tomorrow, we may not be able to make all the repairs until Thursday. We will send you another email update if we have to extend the closure.

As always, please contact Mark McCulloch, project manager if you have any questions – mccullochm@wcroads.org or (734) 327-6679.

June 11, 2018 Textile Road Full Closure to Begin June 18

The full closure of Textile Road between Hines Drive and Michigan Avenue (US-12) in Pittsfield Township is scheduled to begin on Monday, June 18.

When the full closure begins, Textile Road from Hines Drive to Michigan Avenue will only be open to property owners and tenants. People who do not live or own property internal to the project limits will be required to follow posted detour routes or seek an alternate route while work is occurring.

The goal is to have Textile Road reopened to traffic by mid-November.

Questions?

March 27, 2018 Textile Road and Platt-Textile Greenway: Preliminary Work to Continue

Tree removals have been completed for both Textile Road and the Platt-Textile Greenway. Utility relocation work will continue throughout the spring.

Construction to build the roadway and greenway will begin on or after June 18, 2018.  During construction, Textile Road between Hines Drive and Michigan Avenue (US-12) will be closed to through traffic.

If you have any questions concerning this project, please contact Mark McCulloch, Senior Project Manager, Washtenaw County Road Commission, (734) 327-6679 or mccullochm@wcroads.org

February 16, 2018 Textile Road and Platt-Textile Greenway: Preliminary Work to Begin

WHEN: Monday, February 19, 2018

WHERE: Textile Road between Hines Drive and Michigan Avenue (U.S. 12) in Pittsfield Township

WHY: Textile Road Paving and Platt-Textile Greenway

BACKGROUND: Starting Monday, February 19, 2018, tree removal and site clearing work will begin for the upcoming Textile Road and Platt-Textile Greenway project. The tree removal work will occur along Textile Road between Hines Drive and Michigan Avenue (U.S. 12) in Pittsfield Township and is expected to last up to two weeks.

Construction to build the roadway and greenway will begin in June of this year.   

CONTACT: If you have any questions concerning this project, please contact Mark McCulloch, Senior Project Manager, Washtenaw County Road Commission, (734) 327-6679 or mccullochm@wcroads.org

ISSUE DATE: 02/16/18

January 17, 2018 Feb. 8 Construction Information Meeting – Textile Rd

The Washtenaw County Road Commission (WCRC) will be paving Textile Road from Hines Drive to Michigan Avenue (U.S. 12).

The community is invited to a construction information meeting on Thursday, February 8 at 6:30 p.m. at the Pittsfield Township Hall, 6201 W. Michigan Avenue, Ann Arbor, MI 48108. WCRC staff will be in attendance to share construction details.

During this project WCRC and its contractors will also:

  • In partnership with Pittsfield Township, build the Platt-Textile Greenway, a 1.3 mile non-motorized pathway, which will connect Marsh View Meadows Park to the existing non-motorized pathway running north-south along Platt Road.
  • Replace culverts at the Koch-Warner and Pittsfield No. 5 Drains.
  • Install new traffic signals at the intersections of Textile Road/Michigan Avenue and Textile/Platt Roads.
  • Construct center left-turn lanes at the intersection of Platt/Textile Roads.
  • Resurface pavement from State Road to the end of existing pavement.
  • Install new railroad crossing guards with warning lights at the train tracks.
  • Pave the Old Hickory Trail Parking lot.

Project Timeline:

Tree removal will likely occur in February and March. All other work will begin on or after June 18, 2018. Our goal is to complete the project in Mid-November, weather pending.

Detours and Access:

  • When reconstruction works begins in June of 2018, Textile Road from Hines Drive to Michigan Avenue will only be open to property owners and tenants.
  • Marsh View Meadow Park will remain open with access from Marton Road.
  • Non-residents will be required to follow posted detour routes while work is occurring.
  • In addition, sometime between June and October, the intersection of Platt Road and Textile Road will be closed to all traffic for a period of time up to four weeks. WCRC will issue a media advisory the week before this closure.
  • WCRC will coordinate mail delivery and garbage collection during the life of the project.