was successfully added to your cart.

North Territorial Road

Location of roadwork:
Spencer Road to Gotfredson Road

Township:
Northfield, Salem

When is the work being done:
Tree Removals: Early February - end of March, Culvert Replacement: July 9 through August 10, Guardrail Installation 08/09/18 through 08/15/18

Description of work:
Culvert Replacement, Guardrail Installation, Roadside Safety Improvements

Impact on Traffic:
Intermittent Lane Closure

Funding Source(s):
Federal, Michigan Transportation Fund (MTF)

Latest Updates

August 10, 2018 Road Reopened: North Territorial Road (Salem Twp)

WHEN: Effective Wednesday, August 8, 2018

WHERE: North Territorial Road between Tower Road and Curtis Road in Salem Township.

WHY: Completion of culvert replacement project

BACKGROUND: On Wednesday, August 8, 2018, the Washtenaw County Road Commission (WCRC) re-opened North Territorial Road between Tower Road and Curtis Road in Salem Township.

CONTACT: If you have any questions concerning this project, please contact Brent Schlack, Assistant Director of Engineering, (734) 327-6670 or schlackb@wcroads.org

For more information about WCRC road closures and re-openings visit wcroads.org/news/media-advisories.

ISSUE DATE: 08/10/18

July 3, 2018 Road Closure: North Territorial Road (Salem Twp)

WHEN: Starting Thursday, July 12, 2018

WHERE: North Territorial Road between Tower Road and Curtis Road in Salem Township

WHY: Culvert replacement

BACKGROUND: On Thursday, July 12, 2018, the Washtenaw County Road Commission (WCRC) and its contractor will close North Territorial Road between Tower Road and Curtis Road in Salem Township for a culvert replacement.

The road will be closed to all through traffic. Local traffic to and from adjacent properties located within the closed section of North Territorial Road will be maintained, but no traffic will be able to cross the culvert itself.

The project is expected to be completed and road reopened by August 10th. However, please be advised that all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Matt MacDonell, director of engineering, (734) 327-6688 or macdonellm@wcroads.org or Kelly Jones, senior project manager, (734) 327-6647 or jonesk@wcroads.org.

For more information about WCRC road closures visit wcroads.org/news/media-advisories.

ISSUE DATE: 07/03/18

January 24, 2018 North Territorial Tree Removal Safety Project Notice

The Washtenaw County Road Commission (WCRC) has been awarded Federal Highway Safety Improvement Funds (HSIP) to improve safety along North Territorial Road from Gotfredson Road in Salem Township to Spencer Road in Northfield Township. These funds were awarded specifically to remove trees that are too close to the roadway and pose a safety risk.

The tree work will begin in early February, with all tree removals done before March 31, 2018. A contractor, approved by the Michigan Department of Transportation (MDOT), will conduct the work.

The plan is to remove trees and brush approximately ten-feet from the edge of pavement within the existing public road right-of-way. Additional dead trees may also be removed from within the public road right-of-way.

Please be advised the contractor is not able to accommodate requests for additional work beyond the scope of the contract.

Contact information:
Brent Schlack
    • (734) 327-6670