Seven Mile Road Bridge Photos

Over the Johnson Creek Tributary in Salem Township

Bridge Inspection Photos taken 6-21-2007

(Click on any thumbnail image to view photo gallery)

thumbnail
Seven Mile Road Short-Span Bridge
thumbnail
Posting at 12-Ton Weight Limit
thumbnail
Crumbling Bridge Railing
thumbnail
Elevation of Seven Mile Road Bridge
thumbnail
View through Seven Mile Road Bridge
thumbnail
Bottom flange hanging from failed beam
thumbnail
Hole through bottom of web in Jack Arch Beam
thumbnail
Hole through bottom of web in Jack Arch Beam
thumbnail
Major crack in west abutment
thumbnail
Major crack in west abutment

Bridge Replacement Photos taken August 28, 2007

(Click on any thumbnail image to view photo gallery)

thumbnail
Seven Mile Road Bridge replacement work begins
thumbnail
Operations crews work to replace the bridge
thumbnail
Operations crews work to replace the bridge
thumbnail
Limestone is applied and rolled prior to final paving
thumbnail
This 40-foot culvert was installed to replace the old short-span bridge
thumbnail
View of the bridge work underway, facing west on Seven Mile Road
thumbnail
View of the bridge facing southwest on Seven Mile Road
thumbnail
View of the bridge facing northwest on Seven Mile Road
thumbnail
Another load of limestone is brought in to cover the culvert
thumbnail
Another load of limestone is brought in to cover the culvert
thumbnail
A Heavy Equipment Operator uses Gradall equipment to spread the limestone
thumbnail
A Heavy Equipment Operator uses Gradall equipment to spread the limestone
thumbnail
The limestone is spread out evenly in between applications
thumbnail
The limestone is spread out evenly in between applications
thumbnail
WCRC Gradall Operators are highly skilled workers
thumbnail
Another load of limestone is brought in by a crew member
thumbnail
Dump truck drivers add more materials to complete the job
thumbnail
Dump truck drivers add more materials to complete the job
thumbnail
This process continues until bridge reconstruction is completed before final paving
thumbnail
This process continues until bridge reconstruction is completed before final paving
thumbnail
This process continues until bridge reconstruction is completed before final paving

Road Commissioners Review on August 30, 2007

(Click on any thumbnail image to view photo gallery)

thumbnail
Csmrs. Dave Rutledge and Fred Veigel examine the new culvert
thumbnail
Cmsrs. Dave Rutledge and Fred Veigel examine the new culvert
thumbnail
The Sign Crew arrives to install new signage for the bridge
thumbnail
Road Cmsr. Rutledge and Steve Puuri talk with the Sign Crew
thumbnail
(L-R) Townsend, Harmon,  Rutledge, Veigel, and Puuri
thumbnail
Cmsr. Veigel observes as the Sign Crew install a sign post for the bridge
thumbnail
A caution sign is secured to the sign post by the crew
thumbnail
A caution sign is secured to the sign post by the crew
thumbnail
The Road Commission and a local proprietor celebrate the bridge reopening

Back to 7-Mile Road Bridge Page