Bridge Inspection Photos taken 6-21-2007
(Click on any thumbnail image to view photo gallery)

Seven Mile Road Short-Span Bridge

Posting at 12-Ton Weight Limit

Crumbling Bridge Railing

Elevation of Seven Mile Road Bridge

View through Seven Mile Road Bridge

Bottom flange hanging from failed beam

Hole through bottom of web in Jack Arch Beam

Hole through bottom of web in Jack Arch Beam

Major crack in west abutment

Major crack in west abutment
Bridge Replacement Photos taken August 28, 2007
(Click on any thumbnail image to view photo gallery)

Seven Mile Road Bridge replacement work begins

Operations crews work to replace the bridge

Operations crews work to replace the bridge

Limestone is applied and rolled prior to final paving

This 40-foot culvert was installed to replace the old short-span bridge

View of the bridge work underway, facing west on Seven Mile Road

View of the bridge facing southwest on Seven Mile Road

View of the bridge facing northwest on Seven Mile Road

Another load of limestone is brought in to cover the culvert

Another load of limestone is brought in to cover the culvert

A Heavy Equipment Operator uses Gradall equipment to spread the limestone

A Heavy Equipment Operator uses Gradall equipment to spread the limestone

The limestone is spread out evenly in between applications

The limestone is spread out evenly in between applications

WCRC Gradall Operators are highly skilled workers

Another load of limestone is brought in by a crew member

Dump truck drivers add more materials to complete the job

Dump truck drivers add more materials to complete the job

This process continues until bridge reconstruction is completed before final paving

This process continues until bridge reconstruction is completed before final paving

This process continues until bridge reconstruction is
completed before final paving
Road Commissioners Review on August 30, 2007
(Click on any thumbnail image to view photo gallery)

Csmrs. Dave Rutledge and Fred Veigel examine the new culvert

Cmsrs. Dave Rutledge and Fred Veigel examine the new culvert

The Sign Crew arrives to install new signage for the bridge

Road Cmsr. Rutledge and Steve Puuri talk with the Sign Crew

(L-R) Townsend, Harmon, Rutledge, Veigel, and Puuri

Cmsr. Veigel observes as the Sign Crew install a sign post for the bridge

A caution sign is secured to the sign post by the crew

A caution sign is secured to the sign post by the crew

The Road Commission and a local proprietor celebrate the bridge reopening
Back to 7-Mile Road Bridge Page