Bids / RFPs

Traffic Calming Project

Furnishing of the Following

Furnishing the Following: 

  • Road Improvement Project - N. Delhi Road from Huron River Drive to Eastgate Drive in Scio Township

Request for Proposal:

Traffic Engineering Services – Baker Road Intersection Improvement Study

Furnishing of the Following:

  • COUNTY WIDE OVERBAND CRACK FILLING PROGRAM

Furnishing the Following: 

  • 2015 Fog Seal Program

Furnishing of the Following:

  • Roll Material
  • Sign Posts
  • Aluminum Sign Blanks 
  • Prefabricated Reflectorized Sign Faces on Flat Aluminum Sign Blanks

FURNISHING THE FOLLOWING: ROADSIDE MOWING SERVICES

Furnishing the Following: One 6,000 Gallon Stainless Steel Tank Trailer

FURNISHING THE FOLLOWING: 

  • WASHTENAW COUNTY P.A. 283  HOT MIX ASPHALT (HMA) PROGRAM

Pages