The mailboxes within the project limits have been temporarily relocated by the contractor. Two locations have been set up outside the work area at the intersections of Oak St & Harris Rd and Forrest Ave & Harris Rd.
Near the completion of the project, the contractor will reinstall each mailbox with a new post as close to it’s previous location as possible.