
Austin Road over the Bauer Drain
38 ft wide X 24 ft long concrete T-Beam Bridge
between Grass Road and Schill Road
39 ft wide x 45 ft long steel stringer bridge
between County Line and McGregor Road
two-lane, single span bridge with length of 73-feet and total clear width of 35.5-feet.
between Huron River Drive and West Delhi Road
17.5 ft wide x 112 ft long steel thru truss bridge
between Klager Road and US-12
16 ft wide x 42 ft long steel stringer bridge
Between Michigan Avenue and Russell Street
Three-lane, single span bridge with length of 105ft and clear width of 48ft
between Cherry Hill Road and Vreeland Road
concrete box culvert
between Sager Road and Scio Church Road
CLOSED
between Steinbach Road and Dancer Road
24-ft. X 24-ft. timber bridge
between Guenther Road and Dancer Road
CLOSED
between Dexter-Chelsea Road and Jeffords Street
concrete three-lane bridge, with a deck span of 62 feet (width), a length of 101 feet, and a clear roadway of 47.75 feet
between Ford Road and M-153
two-lane, single span bridge with a total length of 60-feet and total clear width of 40-feet.
Ridge Road over Fowler Creek
Culvert Replacement
between Stony Creek Road and Willow Road
CLOSED
between Hitchingham Road and Whittaker Road
two-lane, single span bridge with an estimated length of 40ft and a total clear width of 42ft
- Current Project / Closure |
- Upcoming Project |
- Completed Project
555 N. Zeeb Road, Ann Arbor, MI 48103 | Phone: 734.761.1500 | Fax: 734.761.3737
Office and Permit Hours: 7:00 a.m. to 3:30 p.m.
©2011 Washtenaw County Road Commission. All Rights Reserved
This website designed and maintained by IGD Solutions Corporation